CANADA-NEWFOUNDLAND ATLANTIC ACCORD IMPLEMENTATION ACTNewfoundland Offshore Area Petroleum Production and Conservation RegulationsRegulations Respecting Safety, Conservation Practices and the Protection of the Environment in Operations Undertaken for the Production of Petroleum in the Newfoundland Offshore AreaP.C.1995-256 19952
21
[Repealed, SOR/2009-316, s. 105]Short Title[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Interpretation[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Application[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Submission of Information[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Approvals and Authorizations[Repealed, SOR/2009-316, s. 105]General[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Production Operations Authorization[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Approvals[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Evidence of Financial Responsibility[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Well, Pool and Field Evaluations[Repealed, SOR/2009-316, s. 105]Cores[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Production Testing[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Pool Pressure Measurements and Surveys[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Cased Hole Logs[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Fluid Sampling and Analysis[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Operation of Wells[Repealed, SOR/2009-316, s. 105]General[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Well Operation Program Authorization[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Approval for a Well Operation[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Precautions[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Well Operation Report[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Abandonment or Suspension of a Zone or Well[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Production Casing and Tubing[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Fluids for Well Operations[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Annulus Between Well Tubulars[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Surface Controlled Subsurface Safety Valves[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Wellhead and Christmas Tree Equipment[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Emergency Shutdown Valves[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Simultaneous Drilling and Production Operations[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Conservation Requirements[Repealed, SOR/2009-316, s. 105]Reservoir Management[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Voidage Replacement[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Commingled Production[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Flaring and Venting of Gas[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Disposal of Oil[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Production Rates[Repealed, SOR/2009-316, s. 105]General[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Measurements and Testing[Repealed, SOR/2009-316, s. 105]General[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Prorated Production[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Transfer Meters[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Group Production Meters and Test Production Meter Calibration[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Water Meter Calibration[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Gas Meter Calibration[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Condensate Measurement[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Metering Records[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Testing Frequency[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Accuracy of Measurement[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Environmental Requirements[Repealed, SOR/2009-316, s. 105]Physical Environmental Monitoring Equipment[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Physical Environmental Observation and Reporting[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Construction Disturbances[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Hazards[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Handling of Waste Material and Produced Water[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]De-commissioning[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Operations[Repealed, SOR/2009-316, s. 105]Safety Plan and Environmental Protection Plan[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Equipment Requirements[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Testing Requirements for Valves and Sensors[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Maintenance and Replacement of Equipment[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Support Craft[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Standby Vessel[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Support Craft Monitoring[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Communications[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Availability of Regulations[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Suspension of Operations[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Subsea Location[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Safety and Training of Personnel[Repealed, SOR/2009-316, s. 105]General[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Qualifications[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Oil Spill Drills[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Authorized Entry, Inspection and Investigations[Repealed, SOR/2009-316, s. 105]Safety Zones[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Conservation Officer and Safety Officer[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Investigation of Accidents[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Records and Reporting[Repealed, SOR/2009-316, s. 105]System of Units[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Names and Designations[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Change of Operator[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Construction Progress[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Daily Operating Record[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Daily Production Record[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Monthly Production Report[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Submission of Data[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Pilot Scheme[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]Annual Production Report and Annual Environmental Report[Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105][Repealed, SOR/2009-316, s. 105]