<?xml version="1.0"?><Regulation lims:pit-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:current-date="2025-12-02" lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501602" lims:id="1501602" gazette-part="II" regulation-type="SOR" xml:lang="en" xmlns:lims="http://justice.gc.ca/lims"><Identification lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501603" lims:id="1501603"><InstrumentNumber>SOR/2024-272</InstrumentNumber><RegistrationDate><Date><YYYY>2024</YYYY><MM>12</MM><DD>16</DD></Date></RegistrationDate><ConsolidationDate><Date><YYYY>2025</YYYY><MM>12</MM><DD>3</DD></Date></ConsolidationDate><EnablingAuthority lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501604" lims:id="1501604"><XRefExternal reference-type="act" link="C-15.1">CANADIAN ENERGY REGULATOR ACT</XRefExternal></EnablingAuthority><LongTitle lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501605" lims:id="1501605">Canada Offshore Renewable Energy Regulations</LongTitle><RegulationMakerOrder><RegulationMaker>P.C.</RegulationMaker><OrderNumber>2024-1328</OrderNumber><Date><YYYY>2024</YYYY><MM>12</MM><DD>16</DD></Date></RegulationMakerOrder></Identification><Order lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501606" lims:id="1501606"><Provision lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501607" lims:id="1501607" format-ref="indent-0-0" language-align="yes" list-item="no"><Text>Her Excellency the Governor General in Council, on the recommendation of the Minister of Natural Resources, makes the annexed <XRefExternal reference-type="regulation" link="SOR-2024-272">Canada Offshore Renewable Energy Regulations</XRefExternal> under section 312 of the <XRefExternal reference-type="act" link="C-15.1">Canadian Energy Regulator Act</XRefExternal><FootnoteRef idref="fn_81000-2-4934_hq_1676997143">a</FootnoteRef>.</Text><Footnote id="fn_81000-2-4934_hq_1676997143" placement="page" status="official"><Label>a</Label><Text>S.C. 2019, c. 28, s. 10</Text></Footnote></Provision></Order><Body lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501608" lims:id="1501608"><Heading lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501609" lims:id="1501609" level="1"><TitleText>Interpretation</TitleText></Heading><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1501610" lims:id="1501610"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501611" lims:id="1501611">Definitions</MarginalNote><Label>1</Label><Text>The following definitions apply in these Regulations.</Text><Definition lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501612" lims:id="1501612"><Text><DefinedTermEn>Act</DefinedTermEn> means the <XRefExternal reference-type="act" link="C-15.1">Canadian Energy Regulator Act</XRefExternal>. (<DefinedTermFr>Loi</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501613" lims:id="1501613"><Text><DefinedTermEn>certifying authority</DefinedTermEn> means an organization approved by the Regulator under subsection <XRefInternal>40</XRefInternal>(2). (<DefinedTermFr>autorité de certification</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501614" lims:id="1501614"><Text><DefinedTermEn>control system</DefinedTermEn> means any system, station or panel used to control the operation and monitor the status of the equipment used for an offshore renewable energy project or offshore power line. (<DefinedTermFr>système de contrôle</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501615" lims:id="1501615"><Text><DefinedTermEn>operations site</DefinedTermEn> means a site where authorized work or activities are carried on in relation to an offshore renewable energy project or offshore power line. (<DefinedTermFr>emplacement des opérations</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501616" lims:id="1501616"><Text><DefinedTermEn>operator</DefinedTermEn> means an applicant for or holder of an authorization referred to in section 298 of the Act. (<DefinedTermFr>exploitant</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501617" lims:id="1501617"><Text><DefinedTermEn>physical and environmental conditions</DefinedTermEn> means any physical, geotechnical, seismic, oceanographic, meteorological or ice conditions that might affect authorized work or activities. (<DefinedTermFr>conditions physiques et environnementales</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501618" lims:id="1501618"><Text><DefinedTermEn>reportable incident</DefinedTermEn> means any of the following incidents that occur in relation to an offshore renewable energy project or offshore power line:</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501619" lims:id="1501619"><Label>(a)</Label><Text>a loss of life;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501620" lims:id="1501620"><Label>(b)</Label><Text>an injury that prevents an employee from reporting for work or from effectively performing all the duties connected with the employee’s regular work on any day subsequent to the day on which the injury occurred, whether or not that subsequent day is a working day for that employee;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501621" lims:id="1501621"><Label>(c)</Label><Text>a fire or explosion;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501622" lims:id="1501622"><Label>(d)</Label><Text>a collision;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501623" lims:id="1501623"><Label>(e)</Label><Text>any incident that has an adverse effect on the environment, produces debris or introduces into the environment any substance or form of energy that is likely to have an adverse effect on the environment, unless that adverse effect, production or introduction is authorized or explicitly anticipated in an application for an authorization;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501624" lims:id="1501624"><Label>(f)</Label><Text>any incident that results in damage to an archaeological site or burial ground;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501625" lims:id="1501625"><Label>(g)</Label><Text>a significant disruption to authorized work or activities due to the carrying on of an activity, or the introduction into the environment of a substance, by a person unrelated to the project or power line;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501626" lims:id="1501626"><Label>(h)</Label><Text>an impairment to the reliability of the power system of the project or power line;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501627" lims:id="1501627"><Label>(i)</Label><Text>the impairment of any facility, equipment or system that is critical to safety, security or environmental protection or the impairment of a support craft;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501628" lims:id="1501628"><Label>(j)</Label><Text>any incident that results in the implementation of emergency response procedures. (<DefinedTermFr>incident à signaler</DefinedTermFr>)</Text></Paragraph></Definition><Definition lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501629" lims:id="1501629"><Text><DefinedTermEn>support craft</DefinedTermEn> means a vessel, vehicle, aircraft or other conveyance used to provide transportation or assistance to persons at an operations site. (<DefinedTermFr>véhicule de service</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501630" lims:id="1501630"><Text><DefinedTermEn>vessel</DefinedTermEn> has the same meaning as in section 2 of the <XRefExternal reference-type="act" link="C-10.15">Canada Shipping Act, 2001</XRefExternal>. (<DefinedTermFr>navire</DefinedTermFr>)</Text></Definition></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1501631" lims:id="1501631"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501632" lims:id="1501632">Incorporation by reference</MarginalNote><Label>2</Label><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501633" lims:id="1501633"><Label>(1)</Label><Text>In these Regulations, any incorporation by reference of a document is an incorporation of that document as amended from time to time.</Text></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501634" lims:id="1501634"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501635" lims:id="1501635">Bilingual document</MarginalNote><Label>(2)</Label><Text>Despite subsection (1), if a document that is incorporated by reference is available in both official languages, any amendment to it is incorporated only when the amended version is available in both official languages.</Text></Subsection></Section><Heading lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501636" lims:id="1501636" level="1"><TitleText>General Requirements</TitleText></Heading><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1501637" lims:id="1501637"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501638" lims:id="1501638">Carrying on work or activities</MarginalNote><Label>3</Label><Text>For the purposes of subsection 298(2) of the Act, information submitted in an application for an authorization must demonstrate that the work or activities will be carried on in a manner that is safe and secure, that protects property and the environment, that is in conformity with all applicable laws in respect of safety, security and environmental protection and that takes into account the potential impacts of climate change.</Text></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1501639" lims:id="1501639"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501640" lims:id="1501640">Level of detail</MarginalNote><Label>4</Label><Text>The information submitted in support of an application and all documents and information submitted to the Regulator to meet a condition of an authorization must provide a level of detail that is proportionate to the scope, nature and complexity of the proposed work or activities.</Text></Section><Heading lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501641" lims:id="1501641" level="1"><Label>PART 1</Label><TitleText>Offshore Renewable Energy — Wind Energy</TitleText></Heading><Heading lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501642" lims:id="1501642" level="2"><TitleText>Application</TitleText></Heading><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1501643" lims:id="1501643"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501644" lims:id="1501644">Application</MarginalNote><Label>5</Label><Text>This Part applies in respect of offshore renewable energy projects that exploit or aim to exploit the power of the wind to generate electricity and in respect of the offshore power lines associated with those projects.</Text></Section><Heading lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501645" lims:id="1501645" level="2"><TitleText>Application for Authorization and Conditions of Authorization</TitleText></Heading><Heading lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501646" lims:id="1501646" level="3"><TitleText>Requirements for All Applications</TitleText></Heading><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1501647" lims:id="1501647"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501648" lims:id="1501648">Contents</MarginalNote><Label>6</Label><Text>For the purposes of subsection 298(2) of the Act, every application for authorization to carry on work or activities in relation to an offshore renewable energy project or offshore power line must include the following information and documents:</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501649" lims:id="1501649"><Label>(a)</Label><Text>the name and contact information of the authorized representative of the operator;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501650" lims:id="1501650"><Label>(b)</Label><Text>the development concept for the project or power line as a whole, including any plans for overlapping or concurrent authorizations, for the proposed work or activities to be undertaken in stages or for the overall project or power line to be developed in stages;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501651" lims:id="1501651"><Label>(c)</Label><Text>a description of the work or activities that are the subject of the application, including</Text><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501652" lims:id="1501652"><Label>(i)</Label><Text>the objectives to be attained,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501653" lims:id="1501653"><Label>(ii)</Label><Text>the scope of the proposed work or activities, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501654" lims:id="1501654"><Label>(iii)</Label><Text>maps or charts showing the preferred locations of all operations sites, as well as any other locations that are being considered;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501655" lims:id="1501655"><Label>(d)</Label><Text>a description of the anticipated use of support craft, of any other vessel, vehicle, aircraft or conveyance and of associated equipment and systems in carrying on the work or activities that are the subject of the application;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501656" lims:id="1501656"><Label>(e)</Label><Text>an execution plan and a schedule for undertaking the work or activities that are the subject of the application, including, if applicable, an indication of the need for any overlapping or concurrent authorizations or for the work or activities to be undertaken in stages;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501657" lims:id="1501657"><Label>(f)</Label><Text>if applicable, the results of</Text><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501658" lims:id="1501658"><Label>(i)</Label><Text>relevant surveys and monitoring programs, including those in respect of previously authorized work or activities in relation to the project or power line, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501659" lims:id="1501659"><Label>(ii)</Label><Text>relevant analyses and assessments based on the data from such surveys and monitoring programs;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501660" lims:id="1501660"><Label>(g)</Label><Text>a description of how the results referred to in paragraph (f) were taken into account in the planning of the work or activities that are the subject of the application;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501661" lims:id="1501661"><Label>(h)</Label><Text>a description of the measures to be taken to conform with all applicable laws in relation to safety, security or environmental protection;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501662" lims:id="1501662"><Label>(i)</Label><Text>a description of the potential effects that the work or activities that are the subject of the application may have on any other users of the operations site;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501663" lims:id="1501663"><Label>(j)</Label><Text>a list of all the permits and other authorizations that are required in relation to the work or activities that are the subject of the application;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501664" lims:id="1501664"><Label>(k)</Label><Text>the target levels of safety, security and environmental protection that the operator proposes to establish under section <XRefInternal>30</XRefInternal> for the work or activities that are the subject of the application; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501665" lims:id="1501665"><Label>(l)</Label><Text>if the operator is proposing to carry on the work or activities that are the subject of the application in a manner that differs from what was proposed in a previous application, a detailed description of the proposed changes, the rationale for those changes and a description of their effect.</Text></Paragraph></Section><Heading lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501666" lims:id="1501666" level="3"><TitleText>Conditions of Every Authorization</TitleText></Heading><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1501667" lims:id="1501667"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501668" lims:id="1501668">System and plans</MarginalNote><Label>7</Label><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501669" lims:id="1501669"><Label>(1)</Label><Text>For the purposes of subsection 298(9) of the Act, every authorization is subject to the condition that the operator, before the authorized work or activities begin, develop and implement</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501670" lims:id="1501670"><Label>(a)</Label><Text>a management system that meets the requirements set out in section <XRefInternal>8</XRefInternal>;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501671" lims:id="1501671"><Label>(b)</Label><Text>a safety plan that meets the requirements set out in section <XRefInternal>9</XRefInternal>;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501672" lims:id="1501672"><Label>(c)</Label><Text>an environmental protection plan that meets the requirements set out in section <XRefInternal>10</XRefInternal>; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501673" lims:id="1501673"><Label>(d)</Label><Text>an emergency management plan that meets the requirements set out in section <XRefInternal>11</XRefInternal>.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501674" lims:id="1501674"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501675" lims:id="1501675">Submission and approval</MarginalNote><Label>(2)</Label><Text>Every authorization is also subject to the condition that the operator submit the following information and plans to the Regulator and obtain the Regulator’s approval of the information referred to in paragraph (b) and the plans before the authorized work or activities begin:</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501676" lims:id="1501676"><Label>(a)</Label><Text>the name, position and contact information of the accountable person designated under subsection <XRefInternal>24</XRefInternal>(2);</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501677" lims:id="1501677"><Label>(b)</Label><Text>a description of the management system, an explanation of how it has been implemented and a statement, signed by the accountable person, confirming that it has been implemented;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501678" lims:id="1501678"><Label>(c)</Label><Text>the safety plan;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501679" lims:id="1501679"><Label>(d)</Label><Text>the environmental protection plan; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501680" lims:id="1501680"><Label>(e)</Label><Text>the emergency management plan.</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1501681" lims:id="1501681"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501682" lims:id="1501682">Management system</MarginalNote><Label>8</Label><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501683" lims:id="1501683"><Label>(1)</Label><Text>The management system must establish the overall framework for reducing risks to safety, security and the environment, including measures for ensuring the reliable operation of the facilities, equipment and systems related to the offshore renewable energy project or offshore power line and for ensuring an appropriate response in case of an emergency.</Text></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501684" lims:id="1501684"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501685" lims:id="1501685">Overarching requirements</MarginalNote><Label>(2)</Label><Text>The management system must</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501686" lims:id="1501686"><Label>(a)</Label><Text>be commensurate with the scope, nature and complexity of the authorized work or activities and the associated hazards and risks;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501687" lims:id="1501687"><Label>(b)</Label><Text>cover all of the authorized work or activities;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501688" lims:id="1501688"><Label>(c)</Label><Text>be explicit, comprehensive and proactive; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501689" lims:id="1501689"><Label>(d)</Label><Text>foster a culture of safety.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501690" lims:id="1501690"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501691" lims:id="1501691">Standards</MarginalNote><Label>(3)</Label><Text>The management system must identify the management system standards on which it is based.</Text></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501692" lims:id="1501692"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501693" lims:id="1501693">Contents</MarginalNote><Label>(4)</Label><Text>The management system must include overarching policies, processes, procedures and protocols related to safety, security, environmental protection, the reliability of facilities, equipment and systems, and emergency response, including</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501694" lims:id="1501694"><Label>(a)</Label><Text>processes for establishing and maintaining measurable goals and associated performance indicators for the management system;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501695" lims:id="1501695"><Label>(b)</Label><Text>processes for ensuring that persons who are assigned duties or who carry on authorized work or activities in relation to the offshore renewable energy project or offshore power line have the necessary experience, training, qualifications and competence, and receive the supervision that is necessary, for them to perform the duties or carry on the work or activities;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501696" lims:id="1501696"><Label>(c)</Label><Text>policies setting out the roles, responsibilities and authority of all persons performing functions under the management system, as well as processes for making them aware of their roles, responsibilities and authority;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501697" lims:id="1501697"><Label>(d)</Label><Text>processes for</Text><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501698" lims:id="1501698"><Label>(i)</Label><Text>identifying hazards that may arise during the authorized work or activities, including hazards related to human and organizational factors,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501699" lims:id="1501699"><Label>(ii)</Label><Text>assessing the risks associated with the identified hazards and determining the measures to be taken to minimize those risks,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501700" lims:id="1501700"><Label>(iii)</Label><Text>establishing an inventory of the identified hazards and the measures to be taken to minimize the associated risks, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501701" lims:id="1501701"><Label>(iv)</Label><Text>keeping that inventory up to date;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501702" lims:id="1501702"><Label>(e)</Label><Text>processes for internally and externally communicating documents and information related to safety, security, environmental protection, the reliability of facilities, equipment and systems, and emergency response, including processes for informing persons who may be exposed to a hazard of the measures that will be taken to minimize the risks associated with the hazard;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501703" lims:id="1501703"><Label>(f)</Label><Text>processes for coordinating and managing the work of the operator, suppliers, service providers and other persons involved in carrying on the authorized work or activities, including processes for ensuring that the processes and procedures put in place by service providers are consistent with those put in place by the operator;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501704" lims:id="1501704"><Label>(g)</Label><Text>processes for auditing and evaluating the management system to ensure that it is functioning and achieving the measurable goals and associated performance indicators referred to in paragraph (a) and processes for ensuring that, if any deficiencies or areas for improvement are identified, the management system is updated to correct those deficiencies and make improvements;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501705" lims:id="1501705"><Label>(h)</Label><Text>processes for inspecting, monitoring, testing and maintaining all facilities, equipment and systems related to the offshore renewable energy project or offshore power line, including those set out in the integrity management program referred to in paragraph <XRefInternal>18</XRefInternal>(a), if applicable, and processes for ensuring that, if any deficiencies or areas for improvement are identified, measures are taken to correct those deficiencies and make improvements;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501706" lims:id="1501706"><Label>(i)</Label><Text>processes for ensuring continuous improvement, including processes for</Text><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501707" lims:id="1501707"><Label>(i)</Label><Text>internally reporting hazards, reportable incidents and situations that have the potential to result in a reportable incident,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501708" lims:id="1501708"><Label>(ii)</Label><Text>analyzing the hazards, reportable incidents and situations and conducting investigations,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501709" lims:id="1501709"><Label>(iii)</Label><Text>identifying the root cause and causal factors of, and contributing factors to, the hazards, reportable incidents and situations, including any human or organizational factors,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501710" lims:id="1501710"><Label>(iv)</Label><Text>analyzing trends in respect of the hazards, reportable incidents and situations,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501711" lims:id="1501711"><Label>(v)</Label><Text>taking corrective and preventive measures, including measures to manage imminent hazards,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501712" lims:id="1501712"><Label>(vi)</Label><Text>providing feedback to persons who have made a report, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501713" lims:id="1501713"><Label>(vii)</Label><Text>communicating documents and information concerning best practices or lessons learned from the hazards, reportable incidents and situations that might improve safety, security, environmental protection, the reliability of facilities, equipment and systems, and emergency response;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501714" lims:id="1501714"><Label>(j)</Label><Text>processes for identifying, evaluating and managing any changes that could affect safety, security, environmental protection, the reliability of facilities, equipment and systems, and emergency response;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501715" lims:id="1501715"><Label>(k)</Label><Text>processes for receiving information and fielding concerns related to safety, security and environmental protection from the general public and for reviewing and responding to such information and concerns;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501716" lims:id="1501716"><Label>(l)</Label><Text>processes for ensuring that all documents associated with the management system are approved by a person with the necessary authority, reviewed periodically and, if necessary, updated;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501717" lims:id="1501717"><Label>(m)</Label><Text>processes for ensuring that records associated with the management system and records that are necessary to support operational requirements or demonstrate compliance with all laws related to safety, security and environmental protection that apply in respect of the offshore renewable energy project or offshore power line are generated, classified by type, organized and retained and are readily accessible for consultation and examination by persons who require access to them; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501718" lims:id="1501718"><Label>(n)</Label><Text>processes for monitoring compliance and preventing non-compliance with the conditions of the authorization and all laws related to safety, security and environmental protection that apply in respect of the offshore renewable energy project or offshore power line.</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1501719" lims:id="1501719"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501720" lims:id="1501720">Safety plan</MarginalNote><Label>9</Label><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501721" lims:id="1501721"><Label>(1)</Label><Text>The safety plan must set out the procedures, practices and resources, as well as the sequence of key safety-related activities, that are necessary to safely carry on the authorized work or activities and must include the following information:</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501722" lims:id="1501722"><Label>(a)</Label><Text>a description of how the safety plan</Text><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501723" lims:id="1501723"><Label>(i)</Label><Text>integrates and reflects the processes and principles included in the management system that relate to safety, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501724" lims:id="1501724"><Label>(ii)</Label><Text>ensures that the obligations set out in these Regulations with regard to safety are met;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501725" lims:id="1501725"><Label>(b)</Label><Text>a summary of the studies and a description of the processes used to</Text><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501726" lims:id="1501726"><Label>(i)</Label><Text>identify the safety hazards that may arise during the authorized work or activities, including any safety hazards that may arise due to activities taking place in the vicinity of the operations site, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501727" lims:id="1501727"><Label>(ii)</Label><Text>assess the safety risks associated with the identified hazards;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501728" lims:id="1501728"><Label>(c)</Label><Text>a description of the hazards identified under subparagraph (b)(i) and the results of the risk assessment under subparagraph (b)(ii);</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501729" lims:id="1501729"><Label>(d)</Label><Text>a description of the measures to be taken to anticipate, monitor, avoid and minimize the safety risks associated with the identified hazards, including, if hazards related to ice or icing are identified, measures for detecting, anticipating, monitoring and reporting those hazards, as well as measures for data collection and, if applicable, for ice avoidance or deflection;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501730" lims:id="1501730"><Label>(e)</Label><Text>an evaluation of the anticipated effectiveness of the measures referred to in paragraph (d) and of how they will assist in meeting the target levels of safety referred to in section <XRefInternal>30</XRefInternal>;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501731" lims:id="1501731"><Label>(f)</Label><Text>a description of the methods that are to be used to communicate with persons who may be directly affected by the identified hazards regarding the existence of those hazards and the measures that will be taken to minimize the associated safety risks;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501732" lims:id="1501732"><Label>(g)</Label><Text>a description of all the facilities, equipment and systems that are critical to safety and are to be used during the authorized work or activities and a summary of the procedures and policies to be put in place for their inspection, testing and maintenance;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501733" lims:id="1501733"><Label>(h)</Label><Text>a detailed description of all support craft and other vessels, vehicles, aircraft or conveyances that are to be used;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501734" lims:id="1501734"><Label>(i)</Label><Text>a description of the training required by the persons who will carry on the authorized work or activities and the experience, qualifications and competencies that they must possess;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501735" lims:id="1501735"><Label>(j)</Label><Text>a description of the authorized work or activities that involve diving operations and the measures to be taken to ensure that those operations are carried out safely and in accordance with the prevailing industry standards and best practices that are appropriate for the water depth and type of diving involved;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501736" lims:id="1501736"><Label>(k)</Label><Text>a description of the measures to be taken to monitor compliance with the safety plan and to evaluate performance in relation to the plan’s objectives, including data collection and analysis, inspections and auditing;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501737" lims:id="1501737"><Label>(l)</Label><Text>a description of the organizational structure and the chain of command for ensuring that the authorized work or activities are carried on safely; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501738" lims:id="1501738"><Label>(m)</Label><Text>a description of the processes to be put in place to identify, evaluate and manage any changes related to the authorized work or activities that could affect safety.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501739" lims:id="1501739"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501740" lims:id="1501740">Service providers</MarginalNote><Label>(2)</Label><Text>If the operator contracts for the provision of services with respect to the authorized work or activities, the safety plan must also include</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501741" lims:id="1501741"><Label>(a)</Label><Text>a description of how the procurement process takes into consideration service providers’ past performance in relation to safety;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501742" lims:id="1501742"><Label>(b)</Label><Text>a description of service providers’ roles and responsibilities with respect to safety;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501743" lims:id="1501743"><Label>(c)</Label><Text>a description of the measures to be taken to oversee the work or activities of service providers and to ensure that service providers comply with the safety plan; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501744" lims:id="1501744"><Label>(d)</Label><Text>a description of how the operator and service providers will communicate with each other regarding any safety issues that may arise during the work or activities.</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1501745" lims:id="1501745"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501746" lims:id="1501746">Environmental protection plan</MarginalNote><Label>10</Label><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501747" lims:id="1501747"><Label>(1)</Label><Text>The environmental protection plan must set out the procedures, practices and resources to be put in place to manage environmental hazards and protect the environment and must include the following information:</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501748" lims:id="1501748"><Label>(a)</Label><Text>a description of how the environmental protection plan</Text><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501749" lims:id="1501749"><Label>(i)</Label><Text>integrates and reflects the processes and principles included in the management system that relate to environmental protection, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501750" lims:id="1501750"><Label>(ii)</Label><Text>ensures that the obligations set out in these Regulations with regard to environmental protection are met;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501751" lims:id="1501751"><Label>(b)</Label><Text>a summary of the studies and a description of the processes used to</Text><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501752" lims:id="1501752"><Label>(i)</Label><Text>identify the environmental hazards that may arise during the authorized work or activities, including any environmental hazards that may arise due to activities taking place in the vicinity of the operations site, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501753" lims:id="1501753"><Label>(ii)</Label><Text>assess the environmental risks associated with the identified hazards;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501754" lims:id="1501754"><Label>(c)</Label><Text>a description of the hazards identified under subparagraph (b)(i) and the results of the risk assessment under subparagraph (b)(ii);</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501755" lims:id="1501755"><Label>(d)</Label><Text>the measures to be taken to anticipate, monitor, avoid and minimize the environmental risks associated with the identified hazards;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501756" lims:id="1501756"><Label>(e)</Label><Text>an evaluation of the anticipated effectiveness of the measures referred to in paragraph (d) and how they will assist in meeting the target levels of environmental protection referred to in section <XRefInternal>30</XRefInternal>;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501757" lims:id="1501757"><Label>(f)</Label><Text>a description of the methods to be used to communicate with persons who may be directly affected by the identified hazards regarding the existence of those hazards and the measures that will be taken to minimize the associated environmental risks;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501758" lims:id="1501758"><Label>(g)</Label><Text>a description of all the facilities, equipment and systems that are critical to the protection of the environment and are to be used during the authorized work or activities and a summary of the procedures and policies to be put in place for their inspection, testing and maintenance;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501759" lims:id="1501759"><Label>(h)</Label><Text>a description of the organizational structure and the chain of command for ensuring that the authorized work or activities are carried on in a manner that minimizes environmental hazards;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501760" lims:id="1501760"><Label>(i)</Label><Text>a description of the procedure to be followed if an archaeological site or a burial ground is discovered during the authorized work or activities;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501761" lims:id="1501761"><Label>(j)</Label><Text>a description of the measures to be taken to monitor compliance with the environmental protection plan and to evaluate performance in relation to the plan’s objectives, including data collection and analysis, inspections and auditing; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501762" lims:id="1501762"><Label>(k)</Label><Text>a description of the processes to be put in place to identify, evaluate and manage any changes related to the authorized work or activities that could affect the protection of the environment.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501763" lims:id="1501763"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501764" lims:id="1501764">Service providers</MarginalNote><Label>(2)</Label><Text>If the operator contracts for the provision of services with respect to the authorized work or activities, the environmental protection plan must also include</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501765" lims:id="1501765"><Label>(a)</Label><Text>a description of how the procurement process takes into consideration service providers’ past performance in relation to environmental protection;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501766" lims:id="1501766"><Label>(b)</Label><Text>a description of service providers’ roles and responsibilities with respect to environmental protection;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501767" lims:id="1501767"><Label>(c)</Label><Text>a description of the measures to be taken to oversee the work or activities of service providers and to ensure that service providers comply with the environmental protection plan; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501768" lims:id="1501768"><Label>(d)</Label><Text>a description of how the operator and service providers will communicate with each other regarding any environmental issues that may arise during the work or activities.</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1501769" lims:id="1501769"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501770" lims:id="1501770">Emergency management plan</MarginalNote><Label>11</Label><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501771" lims:id="1501771"><Label>(1)</Label><Text>The emergency management plan must set out the emergency response procedures referred to in subsection (2) and any other procedures, practices and resources that are necessary to effectively prepare for, manage and respond to an emergency and must include the following information:</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501772" lims:id="1501772"><Label>(a)</Label><Text>a description of how the emergency management plan</Text><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501773" lims:id="1501773"><Label>(i)</Label><Text>integrates and reflects the processes and principles included in the management system that relate to emergency response, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501774" lims:id="1501774"><Label>(ii)</Label><Text>ensures that the obligations set out in these Regulations with regard to emergency response are met;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501775" lims:id="1501775"><Label>(b)</Label><Text>a description of the types of incidents, in relation to the authorized work or activities, that may require an emergency response, an assessment of the risks associated with each type of incident and a description of the planned emergency response for each type of incident;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501776" lims:id="1501776"><Label>(c)</Label><Text>a description of the organizational structure and the chain of command for emergency response;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501777" lims:id="1501777"><Label>(d)</Label><Text>a method for classifying incidents;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501778" lims:id="1501778"><Label>(e)</Label><Text>a description of the incident management system to be used for emergency response;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501779" lims:id="1501779"><Label>(f)</Label><Text>a description of the methods that are to be used to monitor, constantly and in real time, both the facilities used in the generation and transmission of electrical energy and the work or activities, including at night and during periods of poor visibility;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501780" lims:id="1501780"><Label>(g)</Label><Text>the frequency and scope of the emergency response drills and exercises that are to be carried out to test and validate emergency response procedures and practices; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501781" lims:id="1501781"><Label>(h)</Label><Text>a description of the measures that are to be taken to ensure that first responders, the personnel of relevant medical facilities, organizations and agencies, and persons that are carrying on activities within or in the vicinity of an operations site are informed of, and provided with instructions and updates concerning,</Text><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501782" lims:id="1501782"><Label>(i)</Label><Text>the location of the facilities that are to be used in the generation and transmission of electrical energy,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501783" lims:id="1501783"><Label>(ii)</Label><Text>the potential emergency situations that may arise in relation to those facilities, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501784" lims:id="1501784"><Label>(iii)</Label><Text>the procedures to be followed in case of an emergency.</Text></Subparagraph></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501785" lims:id="1501785"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501786" lims:id="1501786">Emergency response procedures</MarginalNote><Label>(2)</Label><Text>The emergency response procedures must cover the following subjects:</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501787" lims:id="1501787"><Label>(a)</Label><Text>emergency response for each type of incident identified under paragraph (1)(b), including the emergency equipment that is necessary and is to be made available for emergency response to each type of incident;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501788" lims:id="1501788"><Label>(b)</Label><Text>the safe shutdown, in the event of an emergency, of facilities, equipment and systems to be used in the generation and transmission of electrical energy;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501789" lims:id="1501789"><Label>(c)</Label><Text>evacuation plans for personnel carrying on work or activities in the offshore area, including, if applicable, evacuation plans for divers engaged in a dive;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501790" lims:id="1501790"><Label>(d)</Label><Text>the notification, investigation and reporting of incidents under section <XRefInternal>64</XRefInternal>;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501791" lims:id="1501791"><Label>(e)</Label><Text>the protocols for communicating with the relevant federal, provincial and municipal authorities and Indigenous governing bodies during an emergency response; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501792" lims:id="1501792"><Label>(f)</Label><Text>coordination and liaison with all relevant emergency response organizations during an emergency response.</Text></Paragraph></Subsection></Section><Heading lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501793" lims:id="1501793" level="3"><TitleText>Site Assessment</TitleText></Heading><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1501794" lims:id="1501794"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501795" lims:id="1501795">Application — additional contents</MarginalNote><Label>12</Label><Text>For the purposes of subsection 298(2) of the Act, an application for authorization to carry on work or activities in relation to the site assessment for an offshore renewable energy project or offshore power line must include, in addition to the information and documents referred to in section <XRefInternal>6</XRefInternal>,</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501796" lims:id="1501796"><Label>(a)</Label><Text>a description of the surveys that are proposed to be conducted, including any seafloor hazard surveys and any biological, environmental, geological, geotechnical, geophysical, oceanographic, meteorological or archaeological surveys, as well as of any analyses or assessments to be performed using the data obtained from those surveys;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501797" lims:id="1501797"><Label>(b)</Label><Text>a description of the facilities, equipment and systems to be put in place for the site assessment, their proposed location, capabilities and limitations and, if any facilities, equipment or systems are to be installed on or moored to the seafloor, how they will be abandoned or removed;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501798" lims:id="1501798"><Label>(c)</Label><Text>a risk assessment in respect of the proposed work or activities that addresses the safety and security of persons and infrastructure that are at or in the vicinity of an operations site;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501799" lims:id="1501799"><Label>(d)</Label><Text>an environmental and socio-economic assessment in respect of the proposed work or activities; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501800" lims:id="1501800"><Label>(e)</Label><Text>an assessment in respect of the proposed work or activities that addresses the factors referred to in paragraphs 298(3)(d) and (e) of the Act.</Text></Paragraph></Section><Heading lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501801" lims:id="1501801" level="3"><TitleText>Construction, Operation and Maintenance</TitleText></Heading><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1501802" lims:id="1501802"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501803" lims:id="1501803">Application — additional contents</MarginalNote><Label>13</Label><Text>For the purposes of subsection 298(2) of the Act, an application for authorization to carry on work or activities in relation to the construction, operation and maintenance of facilities, equipment and systems related to an offshore renewable energy project or offshore power line must include, in addition to the information and documents referred to in section <XRefInternal>6</XRefInternal>,</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501804" lims:id="1501804"><Label>(a)</Label><Text>a list of the industry standards and best practices to be used in the design of the facilities, equipment and systems, as well as any data sets to be used in establishing operational conditions and extreme loading conditions;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501805" lims:id="1501805"><Label>(b)</Label><Text>a description of the facilities, equipment and systems and their proposed location, capabilities and limitations, including, in the case of an offshore power line, maps that show</Text><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501806" lims:id="1501806"><Label>(i)</Label><Text>if applicable, the preferred location of each terminal point and each provincial interconnection point for the power line, as well as any other locations that are being considered,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501807" lims:id="1501807"><Label>(ii)</Label><Text>the preferred route for the power line, as well as any other routes that are being considered,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501808" lims:id="1501808"><Label>(iii)</Label><Text>constraints and hazards that restrict the preferred locations referred to in subparagraph (i) or the preferred route referred to in subparagraph (ii), and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501809" lims:id="1501809"><Label>(iv)</Label><Text>the width of the proposed corridor for the power line, accompanied by the reasons for the selected width;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501810" lims:id="1501810"><Label>(c)</Label><Text>a description of any existing infrastructure that was identified during the site assessment and an explanation of how that infrastructure was taken into account in the planning of the proposed work or activities;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501811" lims:id="1501811"><Label>(d)</Label><Text>a risk assessment in respect of the proposed work or activities for the construction, operation and maintenance of the facilities, equipment and systems, as well as the anticipated work or activities for their decommissioning and abandonment, that addresses the safety and security of persons and infrastructure that are at, on or in the vicinity of the facilities, equipment or systems, including an assessment of any risks associated with the operation of vessels, vehicles, aircraft or other conveyances in that vicinity;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501812" lims:id="1501812"><Label>(e)</Label><Text>an environmental and socio-economic assessment in respect of the proposed work or activities for the construction, operation and maintenance of the facilities, equipment and systems, as well as the anticipated work or activities for their decommissioning and abandonment;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501813" lims:id="1501813"><Label>(f)</Label><Text>an assessment in respect of the proposed work or activities for the construction, operation and maintenance of the facilities, equipment and systems, as well as the anticipated work or activities for their decommissioning and abandonment, that addresses the factors referred to in paragraphs 298(3)(d) and (e) of the Act;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501814" lims:id="1501814"><Label>(g)</Label><Text>a description of the quality assurance program referred to in section <XRefInternal>26</XRefInternal> and an indication of the standard referred to in subsection <XRefInternal>26</XRefInternal>(3) with which the program conforms;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501815" lims:id="1501815"><Label>(h)</Label><Text>the name of the organization that the operator proposes to engage as a certifying authority, a description of the organization’s qualifications to assume the responsibilities referred to in subsection <XRefInternal>40</XRefInternal>(3) and the proposed general scope and timing of the activities to be carried out by the organization in relation to the issuance of a certificate of fitness under subsection <XRefInternal>44</XRefInternal>(1);</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501816" lims:id="1501816"><Label>(i)</Label><Text>an overview of the anticipated decommissioning and abandonment plan that will be submitted under paragraph <XRefInternal>21</XRefInternal>(a); and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501817" lims:id="1501817"><Label>(j)</Label><Text>an estimate of the costs of the decommissioning and abandonment and an indication of the manner in which the operator will finance or pay for those costs.</Text></Paragraph></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1501818" lims:id="1501818"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501819" lims:id="1501819">Additional conditions — construction</MarginalNote><Label>14</Label><Text>For the purposes of subsection 298(9) of the Act, an authorization in relation to the construction, operation and maintenance of facilities, equipment and systems related to an offshore renewable energy project or offshore power line is, in addition to being subject to the conditions set out in section <XRefInternal>7</XRefInternal>, subject to the condition that the operator ensure that the following documents and information are submitted to and approved by the Regulator before the authorized work or activities related to construction begin:</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501820" lims:id="1501820"><Label>(a)</Label><Text>a facility design report that meets the requirements of section <XRefInternal>15</XRefInternal>;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501821" lims:id="1501821"><Label>(b)</Label><Text>a fabrication and construction report that meets the requirements of section <XRefInternal>16</XRefInternal>;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501822" lims:id="1501822"><Label>(c)</Label><Text>a facilities reliability report that meets the requirements of section <XRefInternal>17</XRefInternal>;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501823" lims:id="1501823"><Label>(d)</Label><Text>a description of a preliminary version of the integrity management program that will be submitted under paragraph <XRefInternal>18</XRefInternal>(a);</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501824" lims:id="1501824"><Label>(e)</Label><Text>a description of the navigational safety zones proposed for the purposes of paragraph <XRefInternal>28</XRefInternal>(1)(a) or a justification of why navigational safety zones are not needed; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501825" lims:id="1501825"><Label>(f)</Label><Text>the plan referred to in section <XRefInternal>45</XRefInternal>, prepared by the certifying authority, for the periodic inspection of the facilities, equipment and systems during their construction.</Text></Paragraph></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1501826" lims:id="1501826"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501827" lims:id="1501827">Facility design report</MarginalNote><Label>15</Label><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501828" lims:id="1501828"><Label>(1)</Label><Text>The facility design report must contain a comprehensive description of the design of the facilities, equipment and systems related to the offshore renewable energy project or offshore power line that are outlined in the authorization, including</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501829" lims:id="1501829"><Label>(a)</Label><Text>a summary of the engineering design criteria and data;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501830" lims:id="1501830"><Label>(b)</Label><Text>a summary of the physical and environmental data used in analyzing the design of the facilities, equipment and systems;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501831" lims:id="1501831"><Label>(c)</Label><Text>front, side and plan view technical drawings of the facilities;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501832" lims:id="1501832"><Label>(d)</Label><Text>a list of the industry standards and best practices used in the design of the facilities, equipment and systems, as well as any data sets used in establishing operational conditions and extreme loading conditions;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501833" lims:id="1501833"><Label>(e)</Label><Text>a complete set of structural drawings to be used for the fabrication and construction of the facilities, equipment and systems;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501834" lims:id="1501834"><Label>(f)</Label><Text>the target levels of safety, security and environmental protection referred to in section <XRefInternal>30</XRefInternal>;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501835" lims:id="1501835"><Label>(g)</Label><Text>a copy of the studies used in designing the facilities, equipment and systems and planning their installation;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501836" lims:id="1501836"><Label>(h)</Label><Text>a description of the loads that will be imposed on the facilities;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501837" lims:id="1501837"><Label>(i)</Label><Text>detailed information on</Text><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501838" lims:id="1501838"><Label>(i)</Label><Text>the structural integrity of facilities, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501839" lims:id="1501839"><Label>(ii)</Label><Text>the stability and motion response characteristics of any floating infrastructure;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501840" lims:id="1501840"><Label>(j)</Label><Text>a description of the major mechanical components to be used in the facilities, equipment and systems, including design drawings that illustrate and identify each of those components;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501841" lims:id="1501841"><Label>(k)</Label><Text>a description of the major electrical components to be used in the facilities, equipment and systems, including a single-line diagram that illustrates and identifies each of those components;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501842" lims:id="1501842"><Label>(l)</Label><Text>a description of the measures, including the markings, lighting and signalling, to be put in place to identify the facilities, equipment and systems, warn any vessels, vehicles, aircraft and other conveyances operating in the vicinity of the facilities, equipment and systems of their presence and prevent any collisions, including in reduced visibility conditions; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501843" lims:id="1501843"><Label>(m)</Label><Text>an indication of the anticipated design life of the facilities, equipment and systems, as well as that of their significant components.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501844" lims:id="1501844"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501845" lims:id="1501845">Additional requirements</MarginalNote><Label>(2)</Label><Text>The facility design report must also</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501846" lims:id="1501846"><Label>(a)</Label><Text>demonstrate that the design conforms with all applicable laws and the conditions of the authorization;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501847" lims:id="1501847"><Label>(b)</Label><Text>demonstrate that the design is in keeping with any information provided and any approach, methodology or technology proposed in an application in respect of any previously authorized work or activities in relation to the offshore renewable energy project or offshore power line; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501848" lims:id="1501848"><Label>(c)</Label><Text>include the certification statement referred to in paragraph <XRefInternal>40</XRefInternal>(3)(a).</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1501849" lims:id="1501849"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501850" lims:id="1501850">Fabrication and construction report</MarginalNote><Label>16</Label><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501851" lims:id="1501851"><Label>(1)</Label><Text>The fabrication and construction report must contain a comprehensive description of how the facilities, equipment and systems related to the offshore renewable energy project or offshore power line are to be fabricated, transported, constructed and installed, including</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501852" lims:id="1501852"><Label>(a)</Label><Text>a schedule for the authorized work or activities related to the fabrication and construction of the facilities, equipment and systems;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501853" lims:id="1501853"><Label>(b)</Label><Text>a list of the prevailing industry standards and best practices to be followed to ensure that the facilities, equipment and systems are fabricated and constructed according to the design set out in the facility design report;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501854" lims:id="1501854"><Label>(c)</Label><Text>detailed information about how fabricated components are to be transported to the operations site and installed, including a description of the vessels, equipment, systems and, if applicable, anchoring and mooring arrangements to be used; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501855" lims:id="1501855"><Label>(d)</Label><Text>information concerning the methods and vessels to be used to bury or otherwise protect cables or pipelines, if applicable.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501856" lims:id="1501856"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501857" lims:id="1501857">Additional requirements</MarginalNote><Label>(2)</Label><Text>The fabrication and construction report must also</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501858" lims:id="1501858"><Label>(a)</Label><Text>demonstrate that the fabrication and construction will conform with</Text><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501859" lims:id="1501859"><Label>(i)</Label><Text>all applicable laws,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501860" lims:id="1501860"><Label>(ii)</Label><Text>the conditions of the authorization,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501861" lims:id="1501861"><Label>(iii)</Label><Text>the design set out in the facility design report, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501862" lims:id="1501862"><Label>(iv)</Label><Text>prevailing industry standards and best practices;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501863" lims:id="1501863"><Label>(b)</Label><Text>demonstrate that the fabrication and construction will be in keeping with any information provided and any approach, methodology or technology proposed in an application in respect of previously authorized work or activities in relation to the offshore renewable energy project or the offshore power line; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501864" lims:id="1501864"><Label>(c)</Label><Text>include the certification statement referred to in paragraph <XRefInternal>40</XRefInternal>(3)(b).</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1501865" lims:id="1501865"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501866" lims:id="1501866">Facilities reliability report</MarginalNote><Label>17</Label><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501867" lims:id="1501867"><Label>(1)</Label><Text>The facilities reliability report must describe</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501868" lims:id="1501868"><Label>(a)</Label><Text>the measures to be taken to ensure the reliability of the power system related to the offshore renewable energy project and associated offshore power lines;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501869" lims:id="1501869"><Label>(b)</Label><Text>the impacts that the project and associated power lines will have on the bulk power system;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501870" lims:id="1501870"><Label>(c)</Label><Text>the anticipated maximum power transfer capabilities of the project and associated power lines under both winter and summer conditions, the criteria used to determine those capabilities and the mitigation measures to be taken in the event of severe weather conditions; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501871" lims:id="1501871"><Label>(d)</Label><Text>the reliability standards to which the project and associated power lines will be subject during operation.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501872" lims:id="1501872"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501873" lims:id="1501873">Additional requirement</MarginalNote><Label>(2)</Label><Text>The facilities reliability report must also demonstrate that the measures referred to in paragraph (1)(a) are in conformity with all applicable laws and the conditions of the authorization.</Text></Subsection></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1501874" lims:id="1501874"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501875" lims:id="1501875">Additional conditions — operation and maintenance</MarginalNote><Label>18</Label><Text>For the purposes of subsection 298(9) of the Act, an authorization in relation to the construction, operation and maintenance of facilities, equipment and systems related to an offshore renewable energy project or offshore power line is, in addition to being subject to the conditions set out in sections <XRefInternal>7</XRefInternal> and <XRefInternal>14</XRefInternal>, subject to the condition that the operator ensure that the following documents and information are submitted to and approved by the Regulator before the authorized work or activities related to operation and maintenance begin:</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501876" lims:id="1501876"><Label>(a)</Label><Text>a description of the finalized version of an integrity management program that meets the requirements set out in section <XRefInternal>19</XRefInternal>;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501877" lims:id="1501877"><Label>(b)</Label><Text>a preliminary version of the decommissioning and abandonment plan that will be submitted under paragraph <XRefInternal>21</XRefInternal>(a) that builds on the overview referred to in paragraph <XRefInternal>13</XRefInternal>(i);</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501878" lims:id="1501878"><Label>(c)</Label><Text>any updates to the information provided under paragraph <XRefInternal>13</XRefInternal>(j);</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501879" lims:id="1501879"><Label>(d)</Label><Text>a description of the navigational safety zones proposed for the purposes of paragraph <XRefInternal>28</XRefInternal>(1)(a) or a justification of why navigational safety zones are not needed;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501880" lims:id="1501880"><Label>(e)</Label><Text>the certificate of fitness issued under subsection <XRefInternal>44</XRefInternal>(1) in respect of the facilities, equipment and systems; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501881" lims:id="1501881"><Label>(f)</Label><Text>the plan referred to in section <XRefInternal>45</XRefInternal>, prepared by the certifying authority, for the periodic inspection of the facilities, equipment and systems during their operation and maintenance.</Text></Paragraph></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1501882" lims:id="1501882"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501883" lims:id="1501883">Integrity management program</MarginalNote><Label>19</Label><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501884" lims:id="1501884"><Label>(1)</Label><Text>The integrity management program must be aimed at ensuring that all facilities, equipment and systems related to the offshore renewable energy project or offshore power line</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501885" lims:id="1501885"><Label>(a)</Label><Text>meet the requirements of all applicable laws in respect of the design of such facilities, equipment and systems;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501886" lims:id="1501886"><Label>(b)</Label><Text>are tested, inspected, monitored, maintained and operated in such a way as to ensure safety, security and environmental protection under the operating conditions and maximum loads that are likely to exist during any authorized work or activities; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501887" lims:id="1501887"><Label>(c)</Label><Text>remain fit for the purposes for which they are to be used and can be operated without posing a threat to safety, security or the environment.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501888" lims:id="1501888"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501889" lims:id="1501889">Risk assessment</MarginalNote><Label>(2)</Label><Text>The integrity management program must be based on a risk assessment that is conducted in accordance with industry best practices and that takes into account the assumptions on which the design is based.</Text></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501890" lims:id="1501890"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501891" lims:id="1501891">Monitoring, inspection and testing</MarginalNote><Label>(3)</Label><Text>The integrity management program must set out the measures to be taken by the operator to monitor the condition of the facilities, equipment and systems related to the offshore renewable energy project or offshore power line and to conduct periodic inspections and testing, and must include</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501892" lims:id="1501892"><Label>(a)</Label><Text>the measures to be taken to evaluate the condition of the facilities, equipment and systems and the operational, physical and environmental conditions to which they are subjected;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501893" lims:id="1501893"><Label>(b)</Label><Text>the scope and frequency of the periodic inspections that are necessary to ensure the continued performance and safe functioning of the facilities, equipment and systems;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501894" lims:id="1501894"><Label>(c)</Label><Text>a description of the incidents, including natural events and accidents, that will trigger an inspection; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501895" lims:id="1501895"><Label>(d)</Label><Text>the scope of the inspection to be conducted after an incident occurs.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501896" lims:id="1501896"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501897" lims:id="1501897">Additional requirement</MarginalNote><Label>(4)</Label><Text>The finalized version of the integrity management program must also include the certification statement referred to in paragraph <XRefInternal>40</XRefInternal>(3)(c).</Text></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501898" lims:id="1501898"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501899" lims:id="1501899">Documentation of results</MarginalNote><Label>(5)</Label><Text>The operator must document the results of the monitoring, inspection and testing carried out for the purposes of the integrity management program.</Text></Subsection></Section><Heading lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501900" lims:id="1501900" level="3"><TitleText>Decommissioning and Abandonment</TitleText></Heading><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1501901" lims:id="1501901"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501902" lims:id="1501902">Application — additional contents</MarginalNote><Label>20</Label><Text>For the purposes of subsection 298(2) of the Act, an application for authorization to carry on work or activities in relation to the decommissioning and abandonment of facilities, equipment and systems related to an offshore renewable energy project or offshore power line must include, in addition to the information and documents referred to in section <XRefInternal>6</XRefInternal>,</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501903" lims:id="1501903"><Label>(a)</Label><Text>a description of any existing infrastructure at the operations site and an explanation of how that infrastructure was taken into account in the planning of the work or activities that are the subject of the application;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501904" lims:id="1501904"><Label>(b)</Label><Text>the results of an assessment of the condition of any facilities, equipment or systems that are to be decommissioned and abandoned;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501905" lims:id="1501905"><Label>(c)</Label><Text>a description of the facilities, equipment and systems to be decommissioned and abandoned in place or decommissioned, removed and disposed of, as the case may be, including, if applicable, the methods to be used to remove and transport them and how and where they are to be disposed of;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501906" lims:id="1501906"><Label>(d)</Label><Text>a risk assessment in respect of the work or activities that are the subject of the application that addresses the safety and security of persons and infrastructure that are at, on or in the vicinity of the facilities, equipment or systems, including an assessment of any risks associated with the operation of vessels, vehicles, aircraft or other conveyances in that vicinity;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501907" lims:id="1501907"><Label>(e)</Label><Text>an environmental and socio-economic assessment in respect of the work or activities that are the subject of the application;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501908" lims:id="1501908"><Label>(f)</Label><Text>an assessment in respect of the work or activities that are the subject of the application that addresses the factors referred to in paragraphs 298(3)(d) and (e) of the Act;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501909" lims:id="1501909"><Label>(g)</Label><Text>a description of the methods to be used to restore the operations site after the decommissioning and abandonment of the facilities, equipment and systems; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501910" lims:id="1501910"><Label>(h)</Label><Text>an estimate of the costs of the decommissioning and abandonment and an indication of the manner in which the operator will finance or pay for those costs.</Text></Paragraph></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1501911" lims:id="1501911"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501912" lims:id="1501912">Additional conditions — decommissioning and abandonment</MarginalNote><Label>21</Label><Text>For the purposes of subsection 298(9) of the Act, an authorization in relation to the decommissioning and abandonment of facilities, equipment and systems related to an offshore renewable energy project or offshore power line is, in addition to being subject to the conditions set out in section <XRefInternal>7</XRefInternal>, subject to the condition that the operator ensure that the following document and information are submitted to and approved by the Regulator before the authorized work or activities related to decommissioning and abandonment begin:</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501913" lims:id="1501913"><Label>(a)</Label><Text>a detailed finalized decommissioning and abandonment plan in respect of the facilities, equipment and systems that meets the requirements set out in section <XRefInternal>22</XRefInternal>; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501914" lims:id="1501914"><Label>(b)</Label><Text>a description of the navigational safety zones proposed for the purposes of paragraph <XRefInternal>28</XRefInternal>(1)(a) or a justification of why navigational safety zones are not needed.</Text></Paragraph></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1501915" lims:id="1501915"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501916" lims:id="1501916">Decommissioning and abandonment plan</MarginalNote><Label>22</Label><Text>The decommissioning and abandonment plan must include the following information:</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501917" lims:id="1501917"><Label>(a)</Label><Text>the proposed approach for decommissioning and abandoning the facilities, equipment and systems related to the offshore renewable energy project or offshore power line, including details regarding their removal, transportation and disposal, if applicable;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501918" lims:id="1501918"><Label>(b)</Label><Text>a description of the safety, security and environmental protection measures to be implemented during the decommissioning and abandonment to ensure compliance with all applicable laws;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501919" lims:id="1501919"><Label>(c)</Label><Text>a description of the potential effects that the decommissioning and abandonment will have on the environment and on other users of the operations site; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501920" lims:id="1501920"><Label>(d)</Label><Text>the methods to be used to restore the operations site after the decommissioning and abandonment.</Text></Paragraph></Section><Heading lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501921" lims:id="1501921" level="2"><TitleText>General Requirements for Operators</TitleText></Heading><Heading lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501922" lims:id="1501922" level="3"><TitleText>Management System and Associated Plans</TitleText></Heading><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1501923" lims:id="1501923"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501924" lims:id="1501924">Implementation</MarginalNote><Label>23</Label><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501925" lims:id="1501925"><Label>(1)</Label><Text>The operator must continue to implement the management system, safety plan, environmental protection plan and emergency management plan referred to in section <XRefInternal>7</XRefInternal> for the entire duration of the authorized work or activities in relation to the offshore renewable energy project or offshore power line.</Text></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501926" lims:id="1501926"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501927" lims:id="1501927">Updates</MarginalNote><Label>(2)</Label><Text>The operator must ensure that the management system, safety plan, environmental protection plan and emergency management plan are updated periodically to ensure that they continue to meet the requirements set out in sections <XRefInternal>8</XRefInternal>, <XRefInternal>9</XRefInternal>, <XRefInternal>10</XRefInternal> and <XRefInternal>11</XRefInternal>, respectively.</Text></Subsection></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1501928" lims:id="1501928"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501929" lims:id="1501929">Financial and human resources</MarginalNote><Label>24</Label><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501930" lims:id="1501930"><Label>(1)</Label><Text>The operator must ensure that there are sufficient financial and human resources to implement and continually improve the management system, safety plan, environmental protection plan and emergency management plan.</Text></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501931" lims:id="1501931"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501932" lims:id="1501932">Accountable person</MarginalNote><Label>(2)</Label><Text>The operator must designate one of its employees as the accountable person for the management system, safety plan, environmental protection plan and emergency management plan and ensure that the accountable person has the necessary authority for assigning financial and human resources to develop, implement and make ongoing improvements to that system and those plans.</Text></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501933" lims:id="1501933"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501934" lims:id="1501934">Change — accountable person</MarginalNote><Label>(3)</Label><Text>If there is any change to the name, position or contact information of the accountable person that was submitted under paragraph <XRefInternal>7</XRefInternal>(2)(a), the operator must provide updated information to the Regulator as soon as feasible.</Text></Subsection></Section><Heading lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501935" lims:id="1501935" level="3"><TitleText>Integrity Management Program and Quality Assurance Program</TitleText></Heading><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1501936" lims:id="1501936"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501937" lims:id="1501937">Integrity management program</MarginalNote><Label>25</Label><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501938" lims:id="1501938"><Label>(1)</Label><Text>The operator must implement the integrity management program referred to in paragraph <XRefInternal>18</XRefInternal>(a) for the entire duration of the authorized work or activities in relation to the operation and maintenance of the offshore renewable energy project or offshore power line.</Text></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501939" lims:id="1501939"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501940" lims:id="1501940">Updates</MarginalNote><Label>(2)</Label><Text>The operator must ensure that the integrity management program is updated periodically so that it continues to meet the requirements set out in section <XRefInternal>19</XRefInternal>.</Text></Subsection></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1501941" lims:id="1501941"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501942" lims:id="1501942">Quality assurance program</MarginalNote><Label>26</Label><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501943" lims:id="1501943"><Label>(1)</Label><Text>The operator must develop a quality assurance program in respect of the fabrication, transportation, installation and commissioning of all facilities, equipment and systems related to the offshore renewable energy project or offshore power line and any components used in the maintenance of those facilities, equipment and systems.</Text></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501944" lims:id="1501944"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501945" lims:id="1501945">Requirements</MarginalNote><Label>(2)</Label><Text>The quality assurance program must be comprehensive and must set out the requirements for monitoring, documenting and managing quality to ensure that the facilities, equipment and systems are fit for the purposes for which they are to be used.</Text></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501946" lims:id="1501946"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501947" lims:id="1501947">Conformity with recognized standard</MarginalNote><Label>(3)</Label><Text>The quality assurance program must be in conformity with a recognized Canadian or international standard for quality management.</Text></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501948" lims:id="1501948"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501949" lims:id="1501949">Implementation</MarginalNote><Label>(4)</Label><Text>The operator must implement the quality assurance program for the entire duration of the authorized work or activities other than work or activities related to site assessment.</Text></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501950" lims:id="1501950"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501951" lims:id="1501951">Updates</MarginalNote><Label>(5)</Label><Text>The operator must ensure that the quality assurance program is updated periodically.</Text></Subsection></Section><Heading lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501952" lims:id="1501952" level="3"><TitleText>Other Requirements</TitleText></Heading><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1501953" lims:id="1501953"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501954" lims:id="1501954">Carrying on of authorized work or activities</MarginalNote><Label>27</Label><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501955" lims:id="1501955"><Label>(1)</Label><Text>The operator must carry on all authorized work or activities in a manner that ensures safety, security and environmental protection by</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501956" lims:id="1501956"><Label>(a)</Label><Text>meeting the requirements of the management system, safety plan, environmental protection plan, emergency management plan, integrity management program and quality assurance program and ensuring that all employees, suppliers, service providers and other persons involved in the authorized work or activities meet those requirements;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501957" lims:id="1501957"><Label>(b)</Label><Text>respecting any limitations set out in the certificate of fitness issued in relation to the operation of the facilities, equipment and systems related to the offshore renewable energy project or offshore power line to ensure that their operation does not pose a threat to safety, security or the environment;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501958" lims:id="1501958"><Label>(c)</Label><Text>monitoring the compliance of employees, suppliers, service providers and other persons involved in the authorized work or activities with all conditions of authorization;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501959" lims:id="1501959"><Label>(d)</Label><Text>ensuring the safe and reliable operation of facilities, equipment and systems related to the offshore renewable energy project or offshore power line;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501960" lims:id="1501960"><Label>(e)</Label><Text>taking all reasonable measures to minimize damage to property;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501961" lims:id="1501961"><Label>(f)</Label><Text>taking all reasonable measures to minimize adverse effects for other persons in the offshore area;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501962" lims:id="1501962"><Label>(g)</Label><Text>using the best available technologies for mitigating adverse effects on persons and the environment that are economically feasible to implement;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501963" lims:id="1501963"><Label>(h)</Label><Text>complying with prevailing industry standards and best practices;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501964" lims:id="1501964"><Label>(i)</Label><Text>taking all reasonable measures to prevent debris and to prevent or, if prevention is not possible, minimize the introduction into the environment of any substance or form of energy that is likely to have an adverse effect on the environment; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501965" lims:id="1501965"><Label>(j)</Label><Text>taking all reasonable measures to minimize any adverse effects on persons and the environment when restoring the operations site after the decommissioning and abandonment of the facilities, equipment and systems.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501966" lims:id="1501966"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501967" lims:id="1501967">Equipment and systems</MarginalNote><Label>(2)</Label><Text>The operator must ensure that</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501968" lims:id="1501968"><Label>(a)</Label><Text>all equipment and systems that are used during the authorized work or activities are tested, inspected, maintained, operated and handled in such a way as to ensure safety, security and environmental protection, taking into consideration the manufacturer’s instructions and any applicable standards; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501969" lims:id="1501969"><Label>(b)</Label><Text>any defective components of the equipment or systems are promptly repaired or replaced, taking into consideration the manufacturer’s instructions and any applicable standards.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501970" lims:id="1501970"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501971" lims:id="1501971">Assignment of duties</MarginalNote><Label>(3)</Label><Text>The operator must ensure that persons who are assigned duties or who carry on authorized work or activities</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501972" lims:id="1501972"><Label>(a)</Label><Text>have the necessary experience, training, qualifications and competence to perform the duties or carry on the work or activities in accordance with these Regulations and in a manner that ensures safety, security and environmental protection; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501973" lims:id="1501973"><Label>(b)</Label><Text>are sufficient in number and receive the supervision that is necessary for them to perform the duties or carry on the work or activities in a manner that ensures safety, security and environmental protection.</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1501974" lims:id="1501974"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501975" lims:id="1501975">Navigational safety zones</MarginalNote><Label>28</Label><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501976" lims:id="1501976"><Label>(1)</Label><Text>The operator must take measures to protect facilities, equipment and systems at an operations site against collision with vessels, vehicles, aircraft and other conveyances operating in the vicinity of the facilities, equipment and systems from the time their construction begins until their decommissioning and abandonment is completed, including by</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501977" lims:id="1501977"><Label>(a)</Label><Text>establishing the navigational safety zones referred to in paragraph <XRefInternal>14</XRefInternal>(e), <XRefInternal>18</XRefInternal>(d) or <XRefInternal>21</XRefInternal>(b), as the case may be, that are approved by the Regulator; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501978" lims:id="1501978"><Label>(b)</Label><Text>ensuring that the following information is made available to other persons in the offshore area and brought to the attention of the Canadian Coast Guard, the Department of Transport and the Canadian Hydrographic Service of the Department of Fisheries and Oceans:</Text><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501979" lims:id="1501979"><Label>(i)</Label><Text>the location of the operations site and of the facilities, equipment and systems,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501980" lims:id="1501980"><Label>(ii)</Label><Text>the boundaries of the navigational safety zones, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501981" lims:id="1501981"><Label>(iii)</Label><Text>a description of the risks associated with navigation in the vicinity of the facilities, equipment and systems.</Text></Subparagraph></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501982" lims:id="1501982"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501983" lims:id="1501983">Boundaries of navigational safety zone</MarginalNote><Label>(2)</Label><Text>The establishment of the boundaries of a navigational safety zone must be informed by the risk assessment referred to in paragraph <XRefInternal>13</XRefInternal>(d) or <XRefInternal>20</XRefInternal>(d) as it relates to the risks associated with navigation in the vicinity of the facilities, equipment or systems at the operations site, but the distance between the outer extremity of the facilities, equipment or systems and the perimeter of the safety zone must not exceed 500 m in any direction, except as permitted under paragraph 5 of Article 60 of Part V of the United Nations Convention on the Law of the Sea.</Text></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501984" lims:id="1501984"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501985" lims:id="1501985">Routing systems and measures</MarginalNote><Label>(3)</Label><Text>A navigational safety zone must not interfere with the use of established routing systems and routing measures related to navigational safety.</Text></Subsection></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1501986" lims:id="1501986"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501987" lims:id="1501987">Design requirements</MarginalNote><Label>29</Label><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501988" lims:id="1501988"><Label>(1)</Label><Text>The operator must ensure that all facilities, equipment and systems related to the offshore renewable energy project or offshore power line are designed</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501989" lims:id="1501989"><Label>(a)</Label><Text>in such a way as to ensure safety, security and environmental protection, including by achieving the target levels of safety, security and environmental protection established under section <XRefInternal>30</XRefInternal>;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501990" lims:id="1501990"><Label>(b)</Label><Text>using the best available technologies for minimizing adverse effects on persons, infrastructure and the environment that are economically feasible to implement; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501991" lims:id="1501991"><Label>(c)</Label><Text>in accordance with prevailing industry standards and best practices.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501992" lims:id="1501992"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501993" lims:id="1501993">Factors to be taken into account</MarginalNote><Label>(2)</Label><Text>The design of the facilities, equipment and systems must take into account their intended use, their location and any site-specific physical and environmental conditions.</Text></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501994" lims:id="1501994"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501995" lims:id="1501995">Physical and environmental conditions</MarginalNote><Label>(3)</Label><Text>The operator must ensure that every facility related to the offshore renewable energy project or offshore power line is designed to withstand or avoid all reasonably foreseeable site-specific physical and environmental conditions, including any reasonably foreseeable combination of those conditions, without its structural integrity or any associated equipment or systems that are critical to safety, security and environmental protection being compromised.</Text></Subsection></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1501996" lims:id="1501996"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501997" lims:id="1501997">Target levels</MarginalNote><Label>30</Label><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501998" lims:id="1501998"><Label>(1)</Label><Text>The operator must establish measurable target levels of safety, security and environmental protection for each work or activity carried on in relation to the offshore renewable energy project or offshore power line.</Text></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1501999" lims:id="1501999"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502000" lims:id="1502000">Quantitative or qualitative assessment</MarginalNote><Label>(2)</Label><Text>The target levels of safety, security and environmental protection must be based on a quantitative assessment unless quantitative assessment methods are inappropriate or the quantitative data is not reliable, in which case the target levels must be based on a qualitative assessment.</Text></Subsection></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1502001" lims:id="1502001"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502002" lims:id="1502002">Critical software</MarginalNote><Label>31</Label><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502003" lims:id="1502003"><Label>(1)</Label><Text>The operator must ensure that any software that is critical to safety, security or environmental protection is</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502004" lims:id="1502004"><Label>(a)</Label><Text>secure, reliable and capable of being updated;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502005" lims:id="1502005"><Label>(b)</Label><Text>designed, commissioned and updated in a competent manner; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502006" lims:id="1502006"><Label>(c)</Label><Text>demonstrated to be fit for the purposes for which it is to be used through a testing and validation process that takes into consideration</Text><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502007" lims:id="1502007"><Label>(i)</Label><Text>all foreseeable operating conditions and emergency situations, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502008" lims:id="1502008"><Label>(ii)</Label><Text>system complexity, the dependencies and interactions among systems, software failure modes and the level of risk associated with system failure or malfunction.</Text></Subparagraph></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502009" lims:id="1502009"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502010" lims:id="1502010">Modifications to software features</MarginalNote><Label>(2)</Label><Text>The features of the software referred to in subsection (1) must not be modified unless the necessary internal approvals for the modification are obtained, including the approval of the facility manager.</Text></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502011" lims:id="1502011"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502012" lims:id="1502012">Testing and validation</MarginalNote><Label>(3)</Label><Text>The modified software must not be used until it has been tested and validated in accordance with paragraph (1)(c).</Text></Subsection></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1502013" lims:id="1502013"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502014" lims:id="1502014">Software-dependent control systems</MarginalNote><Label>32</Label><Text>If the failure or malfunction of any integrated software-dependent control systems would cause a hazard to safety, security or the environment, the operator must ensure that</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502015" lims:id="1502015"><Label>(a)</Label><Text>the control systems are designed, installed, commissioned and maintained in such a way as to ensure their reliability, availability and security; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502016" lims:id="1502016"><Label>(b)</Label><Text>measures are implemented and maintained to protect the control systems from any threat, including unauthorized access.</Text></Paragraph></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1502017" lims:id="1502017"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502018" lims:id="1502018">Rescue boat</MarginalNote><Label>33</Label><Text>The operator must ensure that a rescue boat is available and ready for use in the event of an emergency at all times when personnel are present in the offshore area for the purposes of carrying on authorized work or activities.</Text></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1502019" lims:id="1502019"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502020" lims:id="1502020">Requirements for vessels</MarginalNote><Label>34</Label><Text>The operator must ensure that every vessel that is used to carry on authorized work or activities is suitable for the operations site at which it is used and for the nature of the work or activities.</Text></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1502021" lims:id="1502021"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502022" lims:id="1502022">Evacuation systems and equipment</MarginalNote><Label>35</Label><Text>In determining the number of persons that any lifeboat, life raft or marine evacuation system can accommodate, the operator must take into consideration each person’s weight while the person is wearing an immersion suit, as well as the space they require while wearing such a suit.</Text></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1502023" lims:id="1502023"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502024" lims:id="1502024">Third-party assessment</MarginalNote><Label>36</Label><Text>The operator must ensure that a competent third party verifies all equipment that is installed temporarily on a vessel that is used in connection with any authorized work or activities to ensure that the equipment is fit for the purpose for which it is to be used and is secured in a seaworthy manner.</Text></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1502025" lims:id="1502025"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502026" lims:id="1502026">Landing area</MarginalNote><Label>37</Label><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502027" lims:id="1502027"><Label>(1)</Label><Text>If personnel will be transported by aircraft to or within an operations site or between operations sites, the operator must ensure that the landing area for the aircraft, or for any person or cargo being raised to or lowered from the aircraft, is designed to ensure safety, security and environmental protection, including the prevention of incidents or damage due to the use of an aircraft.</Text></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502028" lims:id="1502028"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502029" lims:id="1502029">Specific requirements</MarginalNote><Label>(2)</Label><Text>The operator must ensure that the landing area</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502030" lims:id="1502030"><Label>(a)</Label><Text>does not contain any obstacles that may impede the safe landing or takeoff of aircraft or the safe disembarkation or embarkation of persons or cargo and, if applicable, is oriented relative to the prevailing winds;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502031" lims:id="1502031"><Label>(b)</Label><Text>is able to withstand all functional loads that may be imposed on it;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502032" lims:id="1502032"><Label>(c)</Label><Text>has conspicuous markings and signage; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502033" lims:id="1502033"><Label>(d)</Label><Text>has adequate lighting, including for reduced visibility conditions.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502034" lims:id="1502034"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502035" lims:id="1502035">Specific requirements — landing and takeoff</MarginalNote><Label>(3)</Label><Text>The operator must ensure that any area used for the landing or takeoff of aircraft is capable of accommodating aircraft of expected sizes and is equipped with</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502036" lims:id="1502036"><Label>(a)</Label><Text>emergency response and firefighting equipment;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502037" lims:id="1502037"><Label>(b)</Label><Text>a monitoring system and status light system;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502038" lims:id="1502038"><Label>(c)</Label><Text>communication and meteorological equipment; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502039" lims:id="1502039"><Label>(d)</Label><Text>if the landing area is on a facility, fuel storage tanks.</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1502040" lims:id="1502040"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502041" lims:id="1502041">Procedures and training program</MarginalNote><Label>38</Label><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502042" lims:id="1502042"><Label>(1)</Label><Text>The operator must ensure that</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502043" lims:id="1502043"><Label>(a)</Label><Text>procedures with respect to the support of aircraft operations, including procedures for emergency response, are developed and implemented; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502044" lims:id="1502044"><Label>(b)</Label><Text>a training program is provided for personnel and passengers in respect of those procedures.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502045" lims:id="1502045"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502046" lims:id="1502046">Aircraft service provider</MarginalNote><Label>(2)</Label><Text>Before any authorized work or activities that require the use of an aircraft begin, the operator must ensure that the aircraft service provider has accepted in writing to</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502047" lims:id="1502047"><Label>(a)</Label><Text>comply with all conditions stipulated by the operator with respect to the use of the equipment on any landing area;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502048" lims:id="1502048"><Label>(b)</Label><Text>implement the procedures referred to in paragraph (1)(a); and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502049" lims:id="1502049"><Label>(c)</Label><Text>ensure that all personnel and passengers follow the training program referred to in paragraph (1)(b).</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1502050" lims:id="1502050"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502051" lims:id="1502051">Access to documents and information</MarginalNote><Label>39</Label><Text>The operator must ensure that a copy of the following documents and information is readily accessible at each operations site when personnel are present and at all times at every associated control centre and emergency response operations centre:</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502052" lims:id="1502052"><Label>(a)</Label><Text>every authorization issued in respect of work or activities related to the offshore renewable energy project or offshore power line;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502053" lims:id="1502053"><Label>(b)</Label><Text>all information and documents submitted to the Regulator to meet a condition of authorization, including the safety plan, environmental protection plan and emergency management plan, as well as supporting documentation; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502054" lims:id="1502054"><Label>(c)</Label><Text>all procedures and other documents that are necessary to carry on authorized work or activities in a manner that ensures safety, security and environmental protection.</Text></Paragraph></Section><Heading lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502055" lims:id="1502055" level="2"><TitleText>Certifying Authority and Certificate of Fitness</TitleText></Heading><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1502056" lims:id="1502056"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502057" lims:id="1502057">Certifying authority</MarginalNote><Label>40</Label><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502058" lims:id="1502058"><Label>(1)</Label><Text>The operator must engage the services of an organization to serve as a certifying authority.</Text></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502059" lims:id="1502059"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502060" lims:id="1502060">Approval by Regulator</MarginalNote><Label>(2)</Label><Text>The organization engaged by the operator must be approved as a certifying authority by the Regulator based on the organization’s qualifications to assume the responsibilities referred to in subsection (3).</Text></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502061" lims:id="1502061"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502062" lims:id="1502062">Responsibilities of certifying authority</MarginalNote><Label>(3)</Label><Text>The certifying authority is responsible for</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502063" lims:id="1502063"><Label>(a)</Label><Text>conducting an independent assessment of the facility design report referred to in paragraph <XRefInternal>14</XRefInternal>(a), including an assessment of the design inputs, the methodologies used in the design and the results of any technical studies undertaken in support of the design, and providing a certification statement to the operator that confirms that the proposed design of the facilities, equipment and systems related to the offshore renewable energy project or offshore power line is in accordance with good engineering practices, the authorization and all applicable laws;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502064" lims:id="1502064"><Label>(b)</Label><Text>conducting an independent assessment of the fabrication and construction report referred to in paragraph <XRefInternal>14</XRefInternal>(b) and providing a certification statement to the operator that confirms that the proposed fabrication, construction and installation of the facilities, equipment and systems related to the offshore renewable energy project or offshore power line are in accordance with good engineering practices, the authorization and all applicable laws;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502065" lims:id="1502065"><Label>(c)</Label><Text>conducting an independent assessment of the integrity management program referred to in paragraph <XRefInternal>18</XRefInternal>(a) and providing a certification statement to the operator that confirms that the proposed measures to ensure the integrity of the facilities, equipment and systems related to the offshore renewable energy project or offshore power line are in accordance with good engineering practices, the authorization and all applicable laws;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502066" lims:id="1502066"><Label>(d)</Label><Text>monitoring and carrying out inspections related to the fabrication, transportation, construction, installation and commissioning of the facilities, equipment and systems related to the offshore renewable energy project or offshore power line, including any major maintenance or modifications;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502067" lims:id="1502067"><Label>(e)</Label><Text>assessing whether the facilities, equipment and systems related to the offshore renewable energy project or offshore power line have been fabricated, constructed and installed in accordance with</Text><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502068" lims:id="1502068"><Label>(i)</Label><Text>good engineering practices,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502069" lims:id="1502069"><Label>(ii)</Label><Text>the fabrication and construction report referred to in paragraph <XRefInternal>14</XRefInternal>(b), and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502070" lims:id="1502070"><Label>(iii)</Label><Text>the authorization;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502071" lims:id="1502071"><Label>(f)</Label><Text>verifying that the facilities, equipment and systems related to the offshore renewable energy project or offshore power line are fit for the purposes for which they are to be used and can be operated without posing a threat to safety, security or the environment;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502072" lims:id="1502072"><Label>(g)</Label><Text>issuing a certificate of fitness in respect of the facilities, equipment and systems related to the offshore renewable energy project or offshore power line;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502073" lims:id="1502073"><Label>(h)</Label><Text>periodically performing on-site or remote inspections of the facilities, equipment and systems related to the offshore renewable energy project or offshore power line to verify their continued integrity in accordance with the integrity management program referred to in paragraph <XRefInternal>18</XRefInternal>(a) and ensure that they remain fit for the purposes for which they are to be used and can be operated without posing a threat to safety, security or the environment;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502074" lims:id="1502074"><Label>(i)</Label><Text>validating the effectiveness of any measures implemented by the operator to minimize risks in relation to safety, security and the environment that are associated with the facilities, equipment and systems related to the offshore renewable energy project or offshore power line; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502075" lims:id="1502075"><Label>(j)</Label><Text>verifying that the certificate of fitness remains valid for as long as the facilities, equipment and systems related to the offshore renewable energy project or offshore power line remain in operation.</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1502076" lims:id="1502076"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502077" lims:id="1502077">Operator’s obligations</MarginalNote><Label>41</Label><Text>The operator must ensure that</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502078" lims:id="1502078"><Label>(a)</Label><Text>the certifying authority has, for the purpose of fullfilling its responsibilities, access to the facilities, equipment and systems related to the offshore renewable energy project or offshore power line, as well as to the necessary documentation; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502079" lims:id="1502079"><Label>(b)</Label><Text>the certificate of fitness issued under subsection <XRefInternal>44</XRefInternal>(1) remains valid for as long as the facilities, equipment and systems remain in operation.</Text></Paragraph></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1502080" lims:id="1502080"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502081" lims:id="1502081">Scope of work</MarginalNote><Label>42</Label><Text>The certifying authority must submit a scope of work to the Regulator for approval and obtain the Regulator’s approval before undertaking the relevant activities referred to in subsection <XRefInternal>40</XRefInternal>(3) in relation to the construction, operation and maintenance of the facilities, equipment and systems related to an offshore renewable energy project or offshore power line.</Text></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1502082" lims:id="1502082"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502083" lims:id="1502083">Performance of functions</MarginalNote><Label>43</Label><Text>In performing its functions, the certifying authority must</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502084" lims:id="1502084"><Label>(a)</Label><Text>carry out the scope of work that was approved by the Regulator;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502085" lims:id="1502085"><Label>(b)</Label><Text>use good engineering judgment and practices; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502086" lims:id="1502086"><Label>(c)</Label><Text>ensure that any person that is tasked with carrying out an activity referred to in subsection <XRefInternal>40</XRefInternal>(3) has the necessary experience, training, qualifications and competence to do so.</Text></Paragraph></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1502087" lims:id="1502087"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502088" lims:id="1502088">Certificate of fitness</MarginalNote><Label>44</Label><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502089" lims:id="1502089"><Label>(1)</Label><Text>The certifying authority may, on the basis of the activities referred to in subsection <XRefInternal>40</XRefInternal>(3), issue a certificate of fitness in respect of the facilities, equipment and systems related to the offshore renewable energy project or offshore power line.</Text></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502090" lims:id="1502090"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502091" lims:id="1502091">Fitness for purpose</MarginalNote><Label>(2)</Label><Text>The certificate of fitness must confirm that the facilities, equipment and systems are fit for the purposes for which they are to be used and can be operated without posing a threat to safety, security or the environment.</Text></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502092" lims:id="1502092"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502093" lims:id="1502093">Limitations on operation</MarginalNote><Label>(3)</Label><Text>The certificate of fitness may set out limitations in relation to the operation of the facilities, equipment and systems that the certifying authority considers necessary to ensure that their operation does not pose a threat to safety, security or the environment.</Text></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502094" lims:id="1502094"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502095" lims:id="1502095">Copy provided to Regulator</MarginalNote><Label>(4)</Label><Text>The certifying authority must provide a copy of the certificate of fitness to the Regulator.</Text></Subsection></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1502096" lims:id="1502096"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502097" lims:id="1502097">Inspection plans</MarginalNote><Label>45</Label><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502098" lims:id="1502098"><Label>(1)</Label><Text>The certifying authority must prepare a plan for the periodic inspection of the facilities, equipment and systems related to the offshore renewable energy project or offshore power line during their construction and during their operation and maintenance and provide those plans to the Regulator.</Text></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502099" lims:id="1502099"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502100" lims:id="1502100">Review of operator’s records</MarginalNote><Label>(2)</Label><Text>The inspection plan must</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502101" lims:id="1502101"><Label>(a)</Label><Text>include a schedule for the periodic review of the operator’s records from the management system to identify any changes to the management system that might affect safety, security or environmental protection; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502102" lims:id="1502102"><Label>(b)</Label><Text>be updated as needed to ensure that the facilities, equipment and systems are inspected in light of those changes.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502103" lims:id="1502103"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502104" lims:id="1502104">Scope and frequency of inspections</MarginalNote><Label>(3)</Label><Text>The certifying authority must establish the scope and frequency of the periodic inspections based on a risk assessment conducted in accordance with prevailing industry standards and best practices.</Text></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502105" lims:id="1502105"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502106" lims:id="1502106">Changes to inspection plan</MarginalNote><Label>(4)</Label><Text>The certifying authority must, as soon as circumstances permit, inform the Regulator of any material changes to the inspection plan.</Text></Subsection></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1502107" lims:id="1502107"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502108" lims:id="1502108">Independence and impartiality</MarginalNote><Label>46</Label><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502109" lims:id="1502109"><Label>(1)</Label><Text>The certifying authority must not issue a certificate of fitness in respect of the facilities, equipment and systems related to the offshore renewable energy project or offshore power line unless the certifying authority is able to fulfill its responsibilities under subsection <XRefInternal>40</XRefInternal>(3) with independence and impartiality, including by ensuring that</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502110" lims:id="1502110"><Label>(a)</Label><Text>a separation is maintained between the certification functions that it or any of its subsidiaries or affiliates perform and any work that it or any of its subsidiaries or affiliates undertake with respect to the design, construction, transportation, installation, establishment or commissioning of the facilities, equipment and systems; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502111" lims:id="1502111"><Label>(b)</Label><Text>barriers and processes are in place to prevent real, potential or perceived conflicts of interest.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502112" lims:id="1502112"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502113" lims:id="1502113">Notification of conflict of interest</MarginalNote><Label>(2)</Label><Text>The certifying authority must monitor for real, potential or perceived conflicts of interest throughout the period that it acts as certifying authority for the operator and must, without delay, notify the operator and the Regulator of any such conflicts that are identified.</Text></Subsection></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1502114" lims:id="1502114"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502115" lims:id="1502115">Change of certifying authority</MarginalNote><Label>47</Label><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502116" lims:id="1502116"><Label>(1)</Label><Text>If the operator decides to replace the certifying authority with a new certifying authority, the operator must provide the name of the organization that the operator proposes to engage as the new certifying authority to the Regulator, along with a description of the organization’s qualifications to assume the responsibilities referred to in subsection <XRefInternal>40</XRefInternal>(3).</Text></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502117" lims:id="1502117"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502118" lims:id="1502118">Before issuance of certificate</MarginalNote><Label>(2)</Label><Text>If the operator engages a new certifying authority before the initial certificate of fitness is issued, the new certifying authority must carry out its own independent assessment, monitoring, inspection, verification and validation activities for the purposes of issuing the certificate.</Text></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502119" lims:id="1502119"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502120" lims:id="1502120">After issuance of certificate</MarginalNote><Label>(3)</Label><Text>If the operator engages a new certifying authority after a certificate of fitness has been issued, the operator must develop and submit to the Regulator a transition plan outlining all of the activities to be carried out by the parties before the transition from the former to the new certifying authority and demonstrating that the transition will not result in any gaps, delays or negative effects on the extent and quality of the activities referred to in subsection <XRefInternal>40</XRefInternal>(3).</Text></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502121" lims:id="1502121"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502122" lims:id="1502122">Implementation of transition plan</MarginalNote><Label>(4)</Label><Text>The operator must ensure that the transition plan is implemented.</Text></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502123" lims:id="1502123"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502124" lims:id="1502124">One certificate and one authority</MarginalNote><Label>(5)</Label><Text>There must be no more than one certificate of fitness and one certifying authority in relation to an offshore renewable energy project or offshore power line at any given time.</Text></Subsection></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1502125" lims:id="1502125"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502126" lims:id="1502126">Annual report</MarginalNote><Label>48</Label><Text>Within 30 days after the end of each calendar year during which authorized work or activities are carried on in relation to the construction, operation and maintenance of facilities, equipment and systems related to the offshore renewable energy project or offshore power line, the certifying authority must submit a report for that year to the Regulator that includes</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502127" lims:id="1502127"><Label>(a)</Label><Text>an overview of the activities that it carried out during the calendar year in its capacity as certifying authority;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502128" lims:id="1502128"><Label>(b)</Label><Text>a statement, signed by the certifying authority, confirming that it has maintained the qualifications it possessed when it was approved by the Regulator as a certifying authority;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502129" lims:id="1502129"><Label>(c)</Label><Text>the name, position, contact information and qualifications of the persons that were involved in carrying out the activities referred to in subsection <XRefInternal>40</XRefInternal>(3);</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502130" lims:id="1502130"><Label>(d)</Label><Text>if applicable, a description of the methodologies used to conduct the independent assessments referred to in paragraphs <XRefInternal>40</XRefInternal>(3)(a) to (c) and the assessment referred to in paragraph <XRefInternal>40</XRefInternal>(3)(e) and the results of those assessments;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502131" lims:id="1502131"><Label>(e)</Label><Text>a detailed description of the inspections performed during the calendar year, including their scope and the methodology used, as well as the results;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502132" lims:id="1502132"><Label>(f)</Label><Text>a description of the activities that it carried out to validate the effectiveness of any measures implemented by the operator to minimize risks in relation to safety, security and the environment and the results of that validation.</Text></Paragraph></Section><Heading lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502133" lims:id="1502133" level="1"><Label>PART 2</Label><TitleText>Offshore Renewable Energy — Other Than Wind Energy</TitleText></Heading><Heading lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502134" lims:id="1502134" level="2"><TitleText>Application</TitleText></Heading><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1502135" lims:id="1502135"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502136" lims:id="1502136">Application</MarginalNote><Label>49</Label><Text>This Part applies in respect of offshore renewable energy projects — other than those that exploit or aim to exploit the power of the wind to generate electricity — and the offshore power lines associated with those projects.</Text></Section><Heading lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502137" lims:id="1502137" level="2"><TitleText>Requirements for All Applications</TitleText></Heading><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1502138" lims:id="1502138"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502139" lims:id="1502139">Contents</MarginalNote><Label>50</Label><Text>For the purposes of subsection 298(2) of the Act, every application for authorization to carry on work or activities in relation to an offshore renewable energy project or offshore power line must include the following information and documents:</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502140" lims:id="1502140"><Label>(a)</Label><Text>the name and contact information of the authorized representative of the operator;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502141" lims:id="1502141"><Label>(b)</Label><Text>the development concept for the project or power line as a whole, including any plans for overlapping or concurrent authorizations, for the proposed work or activities to be undertaken in stages or for the overall project or power line to be developed in stages;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502142" lims:id="1502142"><Label>(c)</Label><Text>a description of the work or activities that are the subject of the application, including</Text><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502143" lims:id="1502143"><Label>(i)</Label><Text>the objectives to be attained,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502144" lims:id="1502144"><Label>(ii)</Label><Text>the scope of the proposed work or activities, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502145" lims:id="1502145"><Label>(iii)</Label><Text>maps or charts showing the preferred locations of all operations sites, as well as any other locations that are being considered;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502146" lims:id="1502146"><Label>(d)</Label><Text>a description of the anticipated use of support craft, of any other vessel, vehicle, aircraft or conveyance and of associated equipment and systems in carrying on the work or activities that are the subject of the application;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502147" lims:id="1502147"><Label>(e)</Label><Text>an execution plan and a schedule for undertaking the work or activities that are the subject of the application, including, if applicable, an indication of the need for any overlapping or concurrent authorizations or for the work or activities to be undertaken in stages;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502148" lims:id="1502148"><Label>(f)</Label><Text>if applicable, the results of</Text><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502149" lims:id="1502149"><Label>(i)</Label><Text>relevant surveys and monitoring programs, including those in respect of previously authorized work or activities in relation to the project or power line, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502150" lims:id="1502150"><Label>(ii)</Label><Text>relevant analyses and assessments based on the data from such surveys and monitoring programs;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502151" lims:id="1502151"><Label>(g)</Label><Text>a description of how the results referred to in paragraph (f) were taken into account in the planning of the work or activities that are the subject of the application;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502152" lims:id="1502152"><Label>(h)</Label><Text>a description of the measures to be taken to conform with all applicable laws in relation to safety, security or environmental protection;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502153" lims:id="1502153"><Label>(i)</Label><Text>a description of the potential effects that the work or activities that are the subject of the application may have on any other users of the operations site;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502154" lims:id="1502154"><Label>(j)</Label><Text>a list of all the permits and other authorizations that are required in relation to the work or activities that are the subject of the application;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502155" lims:id="1502155"><Label>(k)</Label><Text>if the operator is proposing to carry on the work or activities that are the subject of the application in a manner that differs from what was proposed in a previous application, a detailed description of the proposed changes, the rationale for those changes and a description of their effect;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502156" lims:id="1502156"><Label>(l)</Label><Text>a risk assessment in respect of the proposed work or activities that addresses the safety and security of persons and infrastructure that are at or in the vicinity of an operations site;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502157" lims:id="1502157"><Label>(m)</Label><Text>an environmental and socio-economic assessment in respect of the proposed work or activities;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502158" lims:id="1502158"><Label>(n)</Label><Text>an assessment in respect of the proposed work or activities that addresses the factors referred to in paragraphs 298(3)(d) and (e) of the Act;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502159" lims:id="1502159"><Label>(o)</Label><Text>a list of the industry standards and best practices to be used in the design of the facilities, equipment and systems that are to be used in the generation and transmission of electrical energy, as well as any data sets to be used in establishing operational conditions and extreme loading conditions;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502160" lims:id="1502160"><Label>(p)</Label><Text>a description of the facilities, equipment and systems that are to be used in the generation and transmission of electrical energy and their proposed location, capabilities and limitations, including, in the case of an offshore power line, maps that show</Text><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502161" lims:id="1502161"><Label>(i)</Label><Text>if applicable, the preferred location of each terminal point and each provincial interconnection point for the power line, as well as any other locations that are being considered,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502162" lims:id="1502162"><Label>(ii)</Label><Text>the preferred route for the power line, as well as any other routes that are being considered,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502163" lims:id="1502163"><Label>(iii)</Label><Text>constraints and hazards that restrict the preferred locations referred to in subparagraph (i) or the preferred route referred to in subparagraph (ii), and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502164" lims:id="1502164"><Label>(iv)</Label><Text>the width of the proposed corridor for the power line, accompanied by the reasons for the selected width; and</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502165" lims:id="1502165"><Label>(q)</Label><Text>the proposed approach to the decommissioning and abandonment of the facilities, equipment and systems related to the project or power line, an estimate of the costs of the decommissioning and abandonment and an indication of the manner in which the operator will finance or pay for those costs.</Text></Paragraph></Section><Heading lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502166" lims:id="1502166" level="2"><TitleText>Conditions of Every Authorization</TitleText></Heading><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1502167" lims:id="1502167"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502168" lims:id="1502168">Plans</MarginalNote><Label>51</Label><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502169" lims:id="1502169"><Label>(1)</Label><Text>For the purposes of subsection 298(9) of the Act, every authorization is subject to the condition that the operator, before the authorized work or activities begin, develop and implement</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502170" lims:id="1502170"><Label>(a)</Label><Text>a safety plan that meets the requirements set out in section <XRefInternal>52</XRefInternal>;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502171" lims:id="1502171"><Label>(b)</Label><Text>an environmental protection plan that meets the requirements set out in section <XRefInternal>53</XRefInternal>; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502172" lims:id="1502172"><Label>(c)</Label><Text>an emergency management plan that meets the requirements set out in section <XRefInternal>54</XRefInternal>.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502173" lims:id="1502173"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502174" lims:id="1502174">Submission and approval</MarginalNote><Label>(2)</Label><Text>Every authorization is also subject to the condition that the operator submit the following information and plans to the Regulator and obtain the Regulator’s approval of the information referred to in paragraph (e) and the plans before the authorized work or activities begin:</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502175" lims:id="1502175"><Label>(a)</Label><Text>the name, position and contact information of the accountable person designated under subsection <XRefInternal>55</XRefInternal>(2);</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502176" lims:id="1502176"><Label>(b)</Label><Text>the safety plan;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502177" lims:id="1502177"><Label>(c)</Label><Text>the environmental protection plan;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502178" lims:id="1502178"><Label>(d)</Label><Text>the emergency management plan; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502179" lims:id="1502179"><Label>(e)</Label><Text>a description of the navigational safety zones proposed for the purposes of paragraph <XRefInternal>57</XRefInternal>(1)(a) or a justification of why navigational safety zones are not needed.</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1502180" lims:id="1502180"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502181" lims:id="1502181">Safety plan</MarginalNote><Label>52</Label><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502182" lims:id="1502182"><Label>(1)</Label><Text>The safety plan must set out the procedures, practices and resources , as well as the sequence of key safety-related activities, that are necessary to safely carry on the authorized work or activities and must include the following information:</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502183" lims:id="1502183"><Label>(a)</Label><Text>a description of how the safety plan ensures that the obligations set out in these Regulations with regard to safety are met;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502184" lims:id="1502184"><Label>(b)</Label><Text>a summary of the studies and a description of the processes used to</Text><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502185" lims:id="1502185"><Label>(i)</Label><Text>identify the safety hazards that may arise during the authorized work or activities, including any safety hazards that may arise due to activities taking place in the vicinity of the operations site, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502186" lims:id="1502186"><Label>(ii)</Label><Text>assess the safety risks associated with the identified hazards;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502187" lims:id="1502187"><Label>(c)</Label><Text>a description of the hazards identified under subparagraph (b)(i) and the results of the risk assessment under subparagraph (b)(ii);</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502188" lims:id="1502188"><Label>(d)</Label><Text>a description of the measures to be taken to anticipate, monitor, avoid and minimize the safety risks associated with the identified hazards, including, if hazards related to ice or icing are identified, measures for detecting, anticipating, monitoring and reporting those hazards, as well as measures for data collection and, if applicable, for ice avoidance or deflection;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502189" lims:id="1502189"><Label>(e)</Label><Text>an evaluation of the anticipated effectiveness of the measures referred to in paragraph (d);</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502190" lims:id="1502190"><Label>(f)</Label><Text>a description of the methods to be used to communicate with persons who may be directly affected by the identified hazards regarding the existence of those hazards and the measures that will be taken to minimize the associated safety risks;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502191" lims:id="1502191"><Label>(g)</Label><Text>a description of all the facilities, equipment and systems that are critical to safety and are to be used during the authorized work or activities and a summary of the procedures and policies to be put in place for their inspection, testing and maintenance;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502192" lims:id="1502192"><Label>(h)</Label><Text>a detailed description of all support craft and other vessels, vehicles, aircraft or conveyances that are to be used;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502193" lims:id="1502193"><Label>(i)</Label><Text>a description of the training required by the persons who will carry on the authorized work or activities and the experience, qualifications and competencies that they must possess;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502194" lims:id="1502194"><Label>(j)</Label><Text>a description of the authorized work or activities that involve diving operations and the measures to be taken to ensure that those operations are carried out safely and in accordance with the prevailing industry standards and best practices that are appropriate for the water depth and type of diving involved;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502195" lims:id="1502195"><Label>(k)</Label><Text>a description of the measures to be taken to monitor compliance with the safety plan and to evaluate performance in relation to the plan’s objectives, including data collection and analysis, inspections and auditing;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502196" lims:id="1502196"><Label>(l)</Label><Text>a description of the organizational structure and the chain of command for ensuring that the authorized work or activities are carried on safely; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502197" lims:id="1502197"><Label>(m)</Label><Text>a description of the processes to be put in place to identify, evaluate and manage any changes related to the authorized work or activities that could affect safety.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502198" lims:id="1502198"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502199" lims:id="1502199">Service providers</MarginalNote><Label>(2)</Label><Text>If the operator contracts for the provision of services with respect to the authorized work or activities, the safety plan must also include</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502200" lims:id="1502200"><Label>(a)</Label><Text>a description of how the procurement process takes into consideration service providers’ past performance in relation to safety;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502201" lims:id="1502201"><Label>(b)</Label><Text>a description of service providers’ roles and responsibilities with respect to safety;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502202" lims:id="1502202"><Label>(c)</Label><Text>a description of the measures to be taken to oversee the work or activities of service providers and to ensure that service providers comply with the safety plan; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502203" lims:id="1502203"><Label>(d)</Label><Text>a description of how the operator and service providers will communicate with each other regarding any safety issues that may arise during the work or activities.</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1502204" lims:id="1502204"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502205" lims:id="1502205">Environmental protection plan</MarginalNote><Label>53</Label><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502206" lims:id="1502206"><Label>(1)</Label><Text>The environmental protection plan must set out the procedures, practices and resources to be put in place to manage environmental hazards and protect the environment and must include the following information:</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502207" lims:id="1502207"><Label>(a)</Label><Text>a description of how the environmental protection plan ensures that the obligations set out in these Regulations with regard to environmental protection are met;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502208" lims:id="1502208"><Label>(b)</Label><Text>a summary of the studies and a description of the processes used to</Text><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502209" lims:id="1502209"><Label>(i)</Label><Text>identify the environmental hazards that may arise during the authorized work or activities, including any environmental hazards that may arise due to activities taking place in the vicinity of the operations site, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502210" lims:id="1502210"><Label>(ii)</Label><Text>assess the environmental risks associated with the identified hazards;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502211" lims:id="1502211"><Label>(c)</Label><Text>a description of the hazards identified under subparagraph (b)(i) and the results of the risk assessment under subparagraph (b)(ii);</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502212" lims:id="1502212"><Label>(d)</Label><Text>the measures to be taken to anticipate, monitor, avoid and minimize the environmental risks associated with the identified hazards;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502213" lims:id="1502213"><Label>(e)</Label><Text>an evaluation of the anticipated effectiveness of the measures referred to in paragraph (d);</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502214" lims:id="1502214"><Label>(f)</Label><Text>a description of the methods to be used to communicate with persons who may be directly affected by the identified hazards regarding the existence of those hazards and the measures that will be taken to minimize the associated environmental risks;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502215" lims:id="1502215"><Label>(g)</Label><Text>a description of all the facilities, equipment and systems that are critical to the protection of the environment and are to be used during the authorized work or activities and a summary of the procedures and policies to be put in place for their inspection, testing and maintenance;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502216" lims:id="1502216"><Label>(h)</Label><Text>a description of the organizational structure and the chain of command for ensuring that the authorized work or activities are carried on in a manner that minimizes environmental hazards;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502217" lims:id="1502217"><Label>(i)</Label><Text>a description of the procedure to be followed if an archaeological site or a burial ground is discovered during the authorized work or activities;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502218" lims:id="1502218"><Label>(j)</Label><Text>a description of the measures to be taken to monitor compliance with the environmental protection plan and to evaluate performance in relation to the plan’s objectives, including data collection and analysis, inspections and auditing; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502219" lims:id="1502219"><Label>(k)</Label><Text>a description of the processes to be put in place to identify, evaluate and manage any changes related to the authorized work or activities that could affect the protection of the environment.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502220" lims:id="1502220"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502221" lims:id="1502221">Service providers</MarginalNote><Label>(2)</Label><Text>If the operator contracts for the provision of services with respect to the authorized work or activities, the environmental protection plan must also include</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502222" lims:id="1502222"><Label>(a)</Label><Text>a description of how the procurement process takes into consideration service providers’ past performance in relation to environmental protection;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502223" lims:id="1502223"><Label>(b)</Label><Text>a description of service providers’ roles and responsibilities with respect to environmental protection;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502224" lims:id="1502224"><Label>(c)</Label><Text>a description of the measures to be taken to oversee the work or activities of service providers and to ensure that service providers comply with the environmental protection plan; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502225" lims:id="1502225"><Label>(d)</Label><Text>a description of how the operator and service providers will communicate with each other regarding any environmental issues that may arise during the work or activities.</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1502226" lims:id="1502226"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502227" lims:id="1502227">Emergency management plan</MarginalNote><Label>54</Label><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502228" lims:id="1502228"><Label>(1)</Label><Text>The emergency management plan must set out the emergency response procedures referred to in subsection (2) and any other procedures, practices and resources that are necessary to effectively prepare for, manage and respond to an emergency and must include the following information:</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502229" lims:id="1502229"><Label>(a)</Label><Text>a description of how the emergency management plan ensures that the obligations set out in these Regulations with regard to emergency response are met;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502230" lims:id="1502230"><Label>(b)</Label><Text>a description of the types of incidents, in relation to the authorized work or activities, that may require an emergency response, an assessment of the risks associated with each type of incident and a description of the planned emergency response for each type of incident;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502231" lims:id="1502231"><Label>(c)</Label><Text>a description of the organizational structure and the chain of command for emergency response;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502232" lims:id="1502232"><Label>(d)</Label><Text>a method for classifying incidents;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502233" lims:id="1502233"><Label>(e)</Label><Text>a description of the incident management system to be used for emergency response;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502234" lims:id="1502234"><Label>(f)</Label><Text>a description of the methods to be used to monitor, constantly and in real time, both the facilities used in the generation and transmission of electrical energy and the work or activities, including at night and during periods of poor visibility;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502235" lims:id="1502235"><Label>(g)</Label><Text>the frequency and scope of the emergency response drills and exercises to be carried out to test and validate emergency response procedures and practices; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502236" lims:id="1502236"><Label>(h)</Label><Text>a description of the measures to be taken to ensure that first responders, the personnel of relevant medical facilities, organizations and agencies, and persons that are carrying on activities within or in the vicinity of an operations site are informed of, and provided with instructions and updates concerning,</Text><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502237" lims:id="1502237"><Label>(i)</Label><Text>the location of the facilities that are to be used in the generation and transmission of electrical energy,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502238" lims:id="1502238"><Label>(ii)</Label><Text>the potential emergency situations that may arise in relation to those facilities, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502239" lims:id="1502239"><Label>(iii)</Label><Text>the procedures to be followed in case of an emergency.</Text></Subparagraph></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502240" lims:id="1502240"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502241" lims:id="1502241">Emergency response procedures</MarginalNote><Label>(2)</Label><Text>The emergency response procedures must cover the following subjects:</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502242" lims:id="1502242"><Label>(a)</Label><Text>emergency response for each type of incident identified under paragraph (1)(b), including the emergency equipment that is necessary and is to be made available for emergency response to each type of incident;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502243" lims:id="1502243"><Label>(b)</Label><Text>the safe shutdown, in the event of an emergency, of facilities, equipment and systems to be used in the generation and transmission of electrical energy;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502244" lims:id="1502244"><Label>(c)</Label><Text>evacuation plans for personnel carrying on work or activities in the offshore area, including, if applicable, evacuation plans for divers engaged in a dive;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502245" lims:id="1502245"><Label>(d)</Label><Text>the notification, investigation and reporting of incidents under section <XRefInternal>64</XRefInternal>;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502246" lims:id="1502246"><Label>(e)</Label><Text>the protocols for communicating with the relevant federal, provincial and municipal authorities and Indigenous governing bodies during an emergency response; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502247" lims:id="1502247"><Label>(f)</Label><Text>coordination and liaison with all relevant emergency response organizations during an emergency response.</Text></Paragraph></Subsection></Section><Heading lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502248" lims:id="1502248" level="2"><TitleText>Implementation of Plans and Other Requirements</TitleText></Heading><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1502249" lims:id="1502249"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502250" lims:id="1502250">Implementation</MarginalNote><Label>55</Label><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502251" lims:id="1502251"><Label>(1)</Label><Text>The operator must ensure that there are sufficient financial and human resources to implement and continually improve the safety plan, environmental protection plan and emergency management plan.</Text></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502252" lims:id="1502252"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502253" lims:id="1502253">Accountable person</MarginalNote><Label>(2)</Label><Text>The operator must designate one of its employees as the accountable person for the safety plan, environmental protection plan and emergency management plan and ensure that the accountable person has the necessary authority for assigning financial and human resources to develop, implement and make ongoing improvements to those plans.</Text></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502254" lims:id="1502254"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502255" lims:id="1502255">Change — accountable person</MarginalNote><Label>(3)</Label><Text>If there is any change to the name, position or contact information of the accountable person that was submitted under paragraph <XRefInternal>51</XRefInternal>(2)(a), the operator must provide updated information to the Regulator as soon as feasible.</Text></Subsection></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1502256" lims:id="1502256"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502257" lims:id="1502257">Conduct of authorized work or activities</MarginalNote><Label>56</Label><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502258" lims:id="1502258"><Label>(1)</Label><Text>The operator must carry on all authorized work or activities in a manner that ensures safety, security and environmental protection by</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502259" lims:id="1502259"><Label>(a)</Label><Text>meeting the requirements of the safety plan, environmental protection plan and emergency management plan and ensuring that all employees, suppliers, service providers and other persons involved in the authorized work or activities meet those requirements;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502260" lims:id="1502260"><Label>(b)</Label><Text>monitoring the compliance of employees, suppliers, service providers and other persons involved in the authorized work or activities with all conditions of authorization;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502261" lims:id="1502261"><Label>(c)</Label><Text>ensuring the safe and reliable operation of facilities, equipment and systems related to the offshore renewable energy project or offshore power line;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502262" lims:id="1502262"><Label>(d)</Label><Text>taking all reasonable measures to minimize damage to property;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502263" lims:id="1502263"><Label>(e)</Label><Text>taking all reasonable measures to minimize adverse effects for other persons in the offshore area;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502264" lims:id="1502264"><Label>(f)</Label><Text>using the best available technologies for mitigating adverse effects on persons and the environment that are economically feasible to implement;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502265" lims:id="1502265"><Label>(g)</Label><Text>complying with prevailing industry standards and best practices;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502266" lims:id="1502266"><Label>(h)</Label><Text>taking all reasonable measures to prevent debris and to prevent or, if prevention is not possible, minimize the introduction into the environment of any substance or form of energy that is likely to have an adverse effect on the environment; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502267" lims:id="1502267"><Label>(i)</Label><Text>taking all reasonable measures to minimize any adverse effects on persons and the environment when restoring the operations site after the decommissioning and abandonment of the facilities, equipment and systems.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502268" lims:id="1502268"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502269" lims:id="1502269">Equipment and systems</MarginalNote><Label>(2)</Label><Text>The operator must ensure that</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502270" lims:id="1502270"><Label>(a)</Label><Text>all equipment and systems that are used during the authorized work or activities are tested, inspected, maintained, operated and handled in such a way as to ensure safety, security and environmental protection, taking into consideration the manufacturer’s instructions and any applicable standards; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502271" lims:id="1502271"><Label>(b)</Label><Text>any defective components of the equipment or systems are promptly repaired or replaced, taking into consideration the manufacturer’s instructions and any applicable standards.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502272" lims:id="1502272"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502273" lims:id="1502273">Assignment of duties</MarginalNote><Label>(3)</Label><Text>The operator must ensure that persons who are assigned duties or who carry out authorized work or activities</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502274" lims:id="1502274"><Label>(a)</Label><Text>have the necessary experience, training, qualifications and competence to perform the duties or carry on the work or activities in accordance with these Regulations and in a manner that ensures safety, security and environmental protection; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502275" lims:id="1502275"><Label>(b)</Label><Text>are sufficient in number and receive the supervision that is necessary for them to perform the duties or carry on the work or activities in a manner that ensures safety, security and environmental protection.</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1502276" lims:id="1502276"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502277" lims:id="1502277">Navigational safety zones</MarginalNote><Label>57</Label><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502278" lims:id="1502278"><Label>(1)</Label><Text>The operator must take measures to protect facilities, equipment and systems at an operations site against collision with vessels, vehicles, aircraft and other conveyances operating in the vicinity of the facilities, equipment and systems from the time their construction begins until their decommissioning and abandonment is completed, including by</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502279" lims:id="1502279"><Label>(a)</Label><Text>establishing the navigational safety zones referred to in paragraph <XRefInternal>51</XRefInternal>(2)(e) that are approved by the Regulator; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502280" lims:id="1502280"><Label>(b)</Label><Text>ensuring that the following information is made available to other persons in the offshore area and brought to the attention of the Canadian Coast Guard, the Department of Transport and the Canadian Hydrographic Service of the Department of Fisheries and Oceans:</Text><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502281" lims:id="1502281"><Label>(i)</Label><Text>the location of the operations site and of the facilities, equipment and systems,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502282" lims:id="1502282"><Label>(ii)</Label><Text>the boundaries of the navigational safety zones, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502283" lims:id="1502283"><Label>(iii)</Label><Text>a description of the risks associated with navigation in the vicinity of the facilities, equipment and systems.</Text></Subparagraph></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502284" lims:id="1502284"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502285" lims:id="1502285">Boundaries of navigational safety zone</MarginalNote><Label>(2)</Label><Text>The establishment of the boundaries of a navigational safety zone must be informed by the risk assessment referred to in paragraph <XRefInternal>50</XRefInternal>(l) as it relates to the risks associated with navigation in the vicinity of the facilities, equipment or systems at the operations site, but the distance between the outer extremity of the facilities, equipment or systems and the perimeter of the safety zone must not exceed 500 m in any direction, except as permitted under paragraph 5 of Article 60 of Part V of the United Nations Convention on the Law of the Sea.</Text></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502286" lims:id="1502286"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502287" lims:id="1502287">Routing systems and measures</MarginalNote><Label>(3)</Label><Text>A navigational safety zone must not interfere with the use of established routing systems and routing measures related to navigational safety.</Text></Subsection></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1502288" lims:id="1502288"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502289" lims:id="1502289">Design requirements</MarginalNote><Label>58</Label><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502290" lims:id="1502290"><Label>(1)</Label><Text>The operator must ensure that all facilities, equipment and systems related to the offshore renewable energy project or offshore power line are designed</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502291" lims:id="1502291"><Label>(a)</Label><Text>in such a way as to ensure safety, security and environmental protection;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502292" lims:id="1502292"><Label>(b)</Label><Text>using the best available technologies for minimizing adverse effects on persons, infrastructure and the environment that are economically feasible to implement; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502293" lims:id="1502293"><Label>(c)</Label><Text>in accordance with prevailing industry standards and best practices.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502294" lims:id="1502294"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502295" lims:id="1502295">Factors to be taken into account</MarginalNote><Label>(2)</Label><Text>The design of the facilities, equipment and systems must take into account their intended use, their location and any site-specific physical and environmental conditions.</Text></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502296" lims:id="1502296"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502297" lims:id="1502297">Physical and environmental conditions</MarginalNote><Label>(3)</Label><Text>The operator must ensure that every facility related to the offshore renewable energy project or offshore power line is designed to withstand or avoid all reasonably foreseeable site-specific physical and environmental conditions, including any reasonably foreseeable combination of those conditions, without its structural integrity or any associated equipment or systems that are critical to safety, security and environmental protection being compromised.</Text></Subsection></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1502298" lims:id="1502298"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502299" lims:id="1502299">Rescue boat</MarginalNote><Label>59</Label><Text>The operator must ensure that a rescue boat is available and ready for use in the event of an emergency at all times when personnel are present in the offshore area for the purposes of carrying on authorized work or activities.</Text></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1502300" lims:id="1502300"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502301" lims:id="1502301">Requirements for vessels</MarginalNote><Label>60</Label><Text>The operator must ensure that every vessel that is used to carry on authorized work or activities is suitable for the operations site at which it is used and for the nature of the work or activities.</Text></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1502302" lims:id="1502302"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502303" lims:id="1502303">Evacuation systems and equipment</MarginalNote><Label>61</Label><Text>In determining the number of persons that any lifeboat, life raft or marine evacuation system can accommodate, the operator must take into consideration each person’s weight while the person is wearing an immersion suit, as well as the space they require while wearing such a suit.</Text></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1502304" lims:id="1502304"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502305" lims:id="1502305">Access to documents and information</MarginalNote><Label>62</Label><Text>The operator must ensure that a copy of the following documents and information is readily accessible at each operations site when personnel are present and at all times at every associated control centre and emergency response operations centre:</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502306" lims:id="1502306"><Label>(a)</Label><Text>every authorization issued in respect of work or activities related to the offshore renewable energy project or offshore power line;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502307" lims:id="1502307"><Label>(b)</Label><Text>all information and documents submitted to the Regulator to meet a condition of authorization, including the safety plan, environmental protection plan and emergency management plan, as well as supporting documentation; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502308" lims:id="1502308"><Label>(c)</Label><Text>all procedures and other documents that are necessary to carry on authorized work or activities in a manner that ensures safety, security and environmental protection.</Text></Paragraph></Section><Heading lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502309" lims:id="1502309" level="1"><Label>PART 3</Label><TitleText>Notification, Investigation, Reporting and Record-Keeping Requirements for Operators</TitleText></Heading><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1502310" lims:id="1502310"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502311" lims:id="1502311">Application</MarginalNote><Label>63</Label><Text>This Part applies in respect of all offshore renewable energy projects and offshore power lines.</Text></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1502312" lims:id="1502312"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502313" lims:id="1502313">Notification of incidents</MarginalNote><Label>64</Label><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502314" lims:id="1502314"><Label>(1)</Label><Text>The operator must notify the Regulator of any reportable incident as soon as the circumstances permit after the incident occurs.</Text></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502315" lims:id="1502315"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502316" lims:id="1502316">Investigation</MarginalNote><Label>(2)</Label><Text>The operator must ensure that every reportable incident is investigated.</Text></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502317" lims:id="1502317"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502318" lims:id="1502318">Incident report</MarginalNote><Label>(3)</Label><Text>The operator must, within 14 days after the day on which a reportable incident occurs, submit a report to the Regulator that includes the following information:</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502319" lims:id="1502319"><Label>(a)</Label><Text>a description of the reportable incident, where and when it occurred and who was involved;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502320" lims:id="1502320"><Label>(b)</Label><Text>a description of the impact of the reportable incident on the facilities, equipment and systems related to the offshore renewable energy project or offshore power line, as well as on vessels, persons and the environment;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502321" lims:id="1502321"><Label>(c)</Label><Text>the results of the investigation into the reportable incident, including details regarding the root cause of the reportable incident and causal and contributing factors;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502322" lims:id="1502322"><Label>(d)</Label><Text>a description of any repairs undertaken to restore any damaged structures to their original design strength or to restore the functionality of any impacted equipment or systems;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502323" lims:id="1502323"><Label>(e)</Label><Text>a description of the measures put in place to prevent the occurrence of similar reportable incidents;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502324" lims:id="1502324"><Label>(f)</Label><Text>if emergency response procedures were implemented, a description of</Text><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502325" lims:id="1502325"><Label>(i)</Label><Text>any communications that occurred with the relevant federal, provincial and municipal authorities and Indigenous governing bodies, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502326" lims:id="1502326"><Label>(ii)</Label><Text>any coordination and liaison with relevant emergency response organizations; and</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502327" lims:id="1502327"><Label>(g)</Label><Text>any other relevant information.</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1502328" lims:id="1502328"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502329" lims:id="1502329">Periodic reports</MarginalNote><Label>65</Label><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502330" lims:id="1502330"><Label>(1)</Label><Text>The operator must submit periodic reports to the Regulator summarizing the following in respect of the period that has elapsed since the day on which the authorization was issued in respect of the work or activities in question or the day after the last day included in the preceding periodic report, as the case may be:</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502331" lims:id="1502331"><Label>(a)</Label><Text>the work or activities performed;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502332" lims:id="1502332"><Label>(b)</Label><Text>the status of the offshore renewable energy project or offshore power line, by reference to the execution plan referred to in paragraph <XRefInternal>6</XRefInternal>(e) or <XRefInternal>50</XRefInternal>(e), as the case may be;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502333" lims:id="1502333"><Label>(c)</Label><Text>any deviations from or changes to the execution plan;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502334" lims:id="1502334"><Label>(d)</Label><Text>any emergency response drills or exercises referred to in paragraph <XRefInternal>11</XRefInternal>(1)(g) or <XRefInternal>54</XRefInternal>(1)(g), as the case may be, that were carried out;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502335" lims:id="1502335"><Label>(e)</Label><Text>any instances of non-conformity with these Regulations and the corrective actions taken; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502336" lims:id="1502336"><Label>(f)</Label><Text>any reportable incidents and any situations that had the potential to result in a reportable incident.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502337" lims:id="1502337"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502338" lims:id="1502338">Beginning of commercial production</MarginalNote><Label>(2)</Label><Text>The periodic reports must also set out the planned date for the beginning of commercial production of renewable energy, if applicable.</Text></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502339" lims:id="1502339"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502340" lims:id="1502340">Frequency of submission</MarginalNote><Label>(3)</Label><Text>The periodic reports must be submitted at the following frequency unless the Commission requires them to be submitted more frequently as a condition of authorization:</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502341" lims:id="1502341"><Label>(a)</Label><Text>in the case of an offshore renewable energy project or offshore power line to which Part 1 applies,</Text><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502342" lims:id="1502342"><Label>(i)</Label><Text>monthly, in respect of authorized work or activities in relation to the construction or the decommissioning and abandonment of facilities, equipment and systems related to the project or power line, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502343" lims:id="1502343"><Label>(ii)</Label><Text>annually, in respect of authorized work or activities in relation to site assessment or the operation and maintenance of facilities, equipment and systems relate to the project or power line; and</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502344" lims:id="1502344"><Label>(b)</Label><Text>in the case of an offshore renewable energy project or offshore power line to which Part 2 applies, annually.</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1502345" lims:id="1502345"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502346" lims:id="1502346">Final report</MarginalNote><Label>66</Label><Text>The operator must, within six months after the day on which all authorized work or activities related to the offshore renewable energy project or offshore power line are completed, submit to the Regulator a final report that includes the following information:</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502347" lims:id="1502347"><Label>(a)</Label><Text>a statement as to whether the work or activities were carried on as planned and as authorized;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502348" lims:id="1502348"><Label>(b)</Label><Text>if the work or activities were not carried on as planned and as authorized, a description of the manner in which the carrying on of the work or activities deviated from what was planned and authorized; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502349" lims:id="1502349"><Label>(c)</Label><Text>a description of the state of the operations site as of the completion of all authorized work and activities.</Text></Paragraph></Section><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1502350" lims:id="1502350"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502351" lims:id="1502351">Record keeping</MarginalNote><Label>67</Label><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502352" lims:id="1502352"><Label>(1)</Label><Text>The operator must keep, at the operator’s principal place of business in Canada, electronic records of</Text><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502353" lims:id="1502353"><Label>(a)</Label><Text>any documents and information submitted to the Regulator in support of an application for authorization;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502354" lims:id="1502354"><Label>(b)</Label><Text>the results of the surveys and programs referred to in subparagraph <XRefInternal>6</XRefInternal>(f)(i) or <XRefInternal>50</XRefInternal>(f)(i), as the case may be, and, if applicable, the surveys referred to in paragraph <XRefInternal>12</XRefInternal>(a);</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502355" lims:id="1502355"><Label>(c)</Label><Text>all documents and information submitted to the Regulator to meet a condition of an authorization; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502356" lims:id="1502356"><Label>(d)</Label><Text>all documents and information that demonstrate that the authorized work or activities were carried on</Text><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502357" lims:id="1502357"><Label>(i)</Label><Text>in a manner that is in keeping with any information provided and any approach, methodology or technology proposed in an application in respect of the authorized work or activities, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502358" lims:id="1502358"><Label>(ii)</Label><Text>in conformity with these Regulations.</Text></Subparagraph></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502359" lims:id="1502359"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502360" lims:id="1502360">Disclosure of records</MarginalNote><Label>(2)</Label><Text>The operator must, on request, disclose the records to the Regulator in the form and manner specified by the Regulator.</Text></Subsection><Subsection lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502361" lims:id="1502361"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502362" lims:id="1502362">Duration of retention</MarginalNote><Label>(3)</Label><Text>The records must be retained for five years after the day on which the decommissioning and abandonment of the facilities, equipment and systems related to the offshore renewable energy project or offshore power line ends, or, if the project or power line is terminated before any construction takes place, for five years after the day on which the site assessment ends.</Text></Subsection></Section><Heading lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502363" lims:id="1502363" level="1"><Label>PART 4</Label><TitleText>Coming into Force</TitleText></Heading><Section lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:lastAmendedDate="2024-12-16" lims:fid="1502364" lims:id="1502364" type="CIFnobold"><MarginalNote lims:inforce-start-date="2024-12-16" lims:enacted-date="2024-12-16" lims:fid="1502365" lims:id="1502365">Registration</MarginalNote><Label>68</Label><Text>These Regulations come into force on the day on which they are registered.</Text></Section></Body></Regulation>