Hull Construction Regulations
Version of section 256 from 2006-03-22 to 2017-02-02:
256 The navigating bridge shall be fitted with an instrument that will indicate any loss or reduction of the ventilating capacity of the power ventilation system referred to in subsection 254(2).
- SOR/83-521, s. 4
- Date modified: