Language selection

Government of Canada

Search

Canada–Nova Scotia Offshore Area Petroleum Operations Framework Regulations

Version of section 83 from 2024-10-28 to 2026-09-16:


Marginal note:Venting limit

  •  (1) An operator must ensure that the volume of gas vented under paragraph 82(a) per installation during a year is not greater than 15 000 standard m3.

  • Marginal note:Definition of vented

    (2) For the purpose of subsection (1), vented means emitted in a controlled manner, other than as a result of combustion, from an installation due to

    • (a) the design of equipment or operational procedures at the installation; or

    • (b) the occurrence of an event that pressurizes the gas beyond the capacity of the equipment at the installation to retain the gas.

Page Details

Date modified: