Government of Canada / Gouvernement du Canada
Symbol of the Government of Canada

Search

Version of document from 2009-12-31 to 2024-11-26:

Canada Oil and Gas Drilling Regulations

SOR/79-82

[Repealed, SOR/2009-315, s. 103] - 2009-12-31

CANADA OIL AND GAS OPERATIONS ACT

Registration 1979-01-22

Regulations Respecting the Exploration and Drilling for and the Conservation of Oil and Gas and the Measures to Ensure the Safety of such Operations

[Repealed, SOR/2009-315, s. 103]

Short Title

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Interpretation

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Application

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Submission of Information

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

PART IGeneral

[Repealed, SOR/2009-315, s. 103]

Application for Authorization

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Conditions of Drilling Program Authorization

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/96-116, s. 3]

Defective or Experimental Equipment

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/96-116, s. 5]

Support Craft

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Standby Craft

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/96-116, s. 7]

Hazards

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Requirements for Drilling Units

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/96-116, s. 9]

Standards For Drilling Equipment

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Meteorological Forecasts

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/96-116, s. 10]

Electrical Equipment

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/96-116, s. 11]

Small Drilling and Service Rigs

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Diving Operations

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/96-116, s. 13]

 [Repealed, SOR/2009-315, s. 103]

Blowout Preventer Requirements

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Casing

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Cementation of Casing

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Marine Riser

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Drilling Fluid System

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Air, Foam and Gas Drilling

[Repealed, SOR/2009-315, s. 103]

[
  • SOR/80-641, s. 21(E)
]

 [Repealed, SOR/2009-315, s. 103]

Testing Equipment

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Manuals

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Contingency Plans

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

PART IIApproval to Drill, Approval to Re-enter or Approval to Drill a Test Hole

[Repealed, SOR/2009-315, s. 103]

Prohibition

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Notification

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Granting, Suspension and Revocation of Approvals

[Repealed, SOR/2009-315, s. 103]

[
  • SOR/96-116, s. 15
]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Surface Improvements

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Location of Well

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Well Prognosis

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Evidence of Financial Responsibility

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/96-116, s. 21]

PART IIIAuthorized Entry, Inspection and Investigations

[Repealed, SOR/2009-315, s. 103]

Conservation Officers and Safety Officers

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/96-116, s. 22]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Investigation of Accidents

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

PART IVDrilling of a Well

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Safety Zone

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Availability of Regulations

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Display of Authorizations, Approvals and Critical Procedures

[Repealed, SOR/2009-315, s. 103]

[
  • SOR/96-116, s. 25
]

 [Repealed, SOR/2009-315, s. 103]

Surveys

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Well Control Equipment

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Safety Valves

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Choke Manifold

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Flow Lines from Wells

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Flare Line and Flare Pit

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Protection of Permafrost

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Pressure Tests of Casing and Preventers

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Coal and Mineral Deposits

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Cementation

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Waiting on Cement Time

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Maximum Pressure During Well Stimulation

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Formation Leak-Off Test

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Monitoring of Drilling

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Volume of Drilling Fluid

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Pressure Transition Zone

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Directional and Deviation Surveys

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Plugging Back of Wells

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Drilling Unsafe to Continue

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Inspections and Tests of Equipment

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/96-116, s. 28]

Inspection of Electrical Equipment

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/96-116, s. 29]

Quantities of Consumables

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Bulk Handling of Fuel and Consumables

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Waste Material

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Radio and Support Craft Procedures

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Moving Drilling Units

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Anchors

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Stability

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/96-116, s. 30]

PART VSafety and Training of Personnel

[Repealed, SOR/2009-315, s. 103]

General

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

General Safety

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Training of Personnel

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Safety Drills

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/96-116, s. 31]

Safety Instruction

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Rest Period

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/96-116, s. 32]

Smoking

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/96-116, s. 33]

Radioactive Substances

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/96-116, s. 34]

PART VIOperational Records and Reports

[Repealed, SOR/2009-315, s. 103]

General

[Repealed, SOR/2009-315, s. 103]

Safety and Well Evaluation Information

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Reference for Well Depths

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Notification of Significant Event

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Notifications to Conservation Engineer

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Submission of Survey Plan

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Tour Sheets and Barge Reports

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Daily Records

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Routine Reports

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Downhole Survey Record

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Penetration and Gas Content Records

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Formation Flow Records

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Report of Structural Faults

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Well Termination Report

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Press Releases

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

PART VIIWell Evaluation

[Repealed, SOR/2009-315, s. 103]

General

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Drill Cuttings

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Cores

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Gas Content of Drilling Fluid

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Wireline Logs

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2002-170, s. 6]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Testing and Sampling of Formations

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Formation Flow Test

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

PART VIIIWell Termination

[Repealed, SOR/2009-315, s. 103]

Application

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Removal of Casing

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Surface Marking and Restoration

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Drilling Rig Removal Prohibited

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Operator Responsible for Abandoned Wells

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Location of Abandonment Plugs

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Length and Quality of Cement Plugs

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Feeling for Plugs

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Termination of Test Holes

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Marking of Well-heads

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Fluid in Abandoned or Suspended Wells

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Suspended Wells

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Well Completion

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

PART IXDeposition of Samples from a Well

[Repealed, SOR/2009-315, s. 103]

General

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Drill Cuttings

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Sidewall Cores

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Conventional Cores

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Analysis of Fluid Samples

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Delivery of Samples and Other Materials to Chief

[Repealed, SOR/2009-315, s. 103]

[
  • SOR/96-116, s. 43(F)
]

 [Repealed, SOR/2009-315, s. 103]

PART XFinal Well Reports

[Repealed, SOR/2009-315, s. 103]

Exploratory and Development Wells

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

Test Holes

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

PART XI[Repealed, SOR/96-116, s. 41]

[Repealed, SOR/2009-315, s. 103]

PART XIIOffences

[Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2009-315, s. 103]

 [Repealed, SOR/2002-170, s. 9]


Date modified: