  •  (1) The maximum BOD of the BOD matter and the maximum quantities of suspended solids that the owner or operator of a mill referred to in paragraph 15(1)(a) may be authorized to deposit, or to permit the deposit of, under an authorization are as follows:

    • (a) in respect of a daily period, the amounts determined using the formula

      Qd = (F × 2.5 × RPR) + [0.375 × (Bo or So)]

    and

    • (b) in respect of a month, the amounts determined using the formula

      Qm = (F × D × 1.5 × RPR) + [0.225 × (Bo or So) × D]

      where

      Bo
      is the average daily BOD of the BOD matter in the waste water from sources other than a mill before it is treated by the mill, calculated for the preceding calendar year and expressed in kilograms,
      D
      is the number of calendar days in the month,
      F
      is equal to a factor of 5 for BOD and 7.5 for suspended solids, expressed in kilograms per tonne of finished product,
      Qd
      is the maximum BOD of the BOD matter that may be deposited during a daily period or the maximum quantity of suspended solids that may be deposited during a daily period, expressed in kilograms,
      Qm
      is the maximum BOD of the BOD matter that may be deposited during a month or the maximum quantity of suspended solids that may be deposited during a month, expressed in kilograms,
      RPR
      is the reference production rate of the mill for all finished product, expressed in tonnes per day, and
      So
      is the average daily quantity of suspended solids in the waste water from sources other than a mill before it is treated by the mill, calculated for the preceding calendar year and expressed in kilograms.
  • (2) The values of Bo and So and the supporting data referred to in paragraph 7(1)(h) for each calendar year shall be submitted to the authorization officer no later than January 31 of the following calendar year.

  • (3) If there are insufficient data on which to calculate the values of Bo and So, an estimate of those values may be made based on the data that are available.

  • SOR/2004-109, s. 15