Pulp and Paper Effluent Regulations
Version of section 20 from 2008-07-28 to 2024-11-26:
20 The maximum BOD of the BOD matter and the maximum quantities of suspended solids that the owner or operator of a mill referred to in paragraph 15(1)(b) may be authorized to deposit, or to permit the deposit of, under an authorization are as follows:
(a) in respect of a daily period, the amounts determined using the formula
Qd = (F1 × 2.5 × RPR1) + (F2 × 2.5 × RPR2)
and
(b) in respect of a month, the amounts determined using the formula
Qm = (F1 × D × 1.5 × RPR1) + (F2 × D × 1.5 × RPR2)
where
- D
- is the number of calendar days in the month,
- F1
- is equal to a factor of 5 for BOD and 7.5 for suspended solids, expressed in kilograms per tonne of finished product other than dissolving grade sulphite pulp,
- F2
- is equal to a factor of 18 for BOD and 25 for suspended solids, expressed in kilograms per tonne of dissolving grade sulphite pulp,
- Qd
- is the maximum BOD of the BOD matter that may be deposited during a daily period or the maximum quantity of suspended solids that may be deposited during a daily period, expressed in kilograms,
- Qm
- is the maximum BOD of the BOD matter that may be deposited during a month or the maximum quantity of suspended solids that may be deposited during a month, expressed in kilograms,
- RPR1
- is the reference production rate of the mill for all finished product other than dissolving grade sulphite pulp, expressed in tonnes per day, and
- RPR2
- is the reference production rate of the mill for dissolving grade sulphite pulp, expressed in tonnes per day.
- SOR/2004-109, s. 15
- SOR/2008-239, s. 6(E)
- Date modified: