Potato Processing Plant Liquid Effluent Regulations (C.R.C., c. 829)
Full Document:
- HTMLFull Document: Potato Processing Plant Liquid Effluent Regulations (Accessibility Buttons available) |
- XMLFull Document: Potato Processing Plant Liquid Effluent Regulations [33 KB] |
- PDFFull Document: Potato Processing Plant Liquid Effluent Regulations [163 KB]
Regulations are current to 2024-11-26
Additional Conditions of Authorization (continued)
Permitted Variation in Additional Conditions
13 Where the owner of a plant establishes to the satisfaction of the Minister that for scientific and technical reasons a scheme of sampling and analysis, measurement or reporting referred to in sections 7, 9, 10 and 12 other than at the regular time interval frequencies required by section 8 is sufficient to enable the Minister to determine whether the owner is complying with the limits of authorized deposits prescribed by section 5, the Minister may, in writing, permit the owner to
(a) take and analyse samples of each effluent in accordance with the scheme on a regular basis specified in the letter of permission,
(b) measure the volume of each effluent in accordance with the scheme on a regular basis specified in the letter of permission, or
(c) report to the Minister in accordance with the scheme on a regular basis specified in the letter of permission
and sections 7, 8, 9, 10 and 12 do not apply to the owner if he complies with the scheme on the regular basis specified in the letter of permission.
- Date modified: