Designated Classes of Projects Order (SOR/2019-323)
Full Document:
- HTMLFull Document: Designated Classes of Projects Order (Accessibility Buttons available) |
- XMLFull Document: Designated Classes of Projects Order [51 KB] |
- PDFFull Document: Designated Classes of Projects Order [186 KB]
Regulations are current to 2024-11-26
SCHEDULE 1(Sections 2 and 4)Designated Classes of Projects (Outside Canada or on Federal Lands not Administered by Parks Canada Agency)
PART 1General
1 The operation, maintenance or repair of a physical work.
2 Physical activities that are carried out entirely within the interior of a building.
3 (1) The construction or operation of a well to conduct geotechnical or environmental investigations of the subsurface characteristics of a site for the purpose of scientific research or of assessing or monitoring the site for contamination.
(2) The decommissioning of a well that was used to conduct a geotechnical or environmental investigation referred to in subsection (1).
(3) The classes of projects described in subsections (1) and (2) do not include projects that involve the placement of temporary or permanent fill in a water body.
PART 2Buildings
4 (1) On developed land, the construction, installation, operation, modification, demolition, decomissioning, removal or replacement of a building that has a footprint of no more than 1 000 m2.
(2) On developed land, the expansion of a building that does not increase the building’s footprint to more than 1 000 m2.
(3) On land other than developed land, the construction or installation of a building that has a footprint of no more than 100 m2.
(4) The classes of projects described in subsections (1) to (3) do not include projects that
(a) involve the placement of temporary or permanent fill in a water body;
(b) involve the disturbance of known or suspected subsurface contamination; or
(c) involve the demolition of a building that is less than 30 m from a school, hospital or residential building.
PART 3Physical Works Related to Building or Other Structure
5 (1) On developed lands, the construction, installation, operation, modification, expansion, replacement, removal or decomissioning of any of the following physical works that are related to a building or other structure and that have a footprint, when combined with the footprint of all other physical works related to the building or structure, of no more than 1 000 m2:
(a) lighting systems;
(b) signage;
(c) fire suppression infrastructure;
(d) parking lots;
(e) paved areas;
(f) charging stations for electrical vehicles;
(g) infrastructure that generates solar or wind power;
(h) fencing that does not prevent the passage of wild animals; and
(i) sidewalks, boardwalks, paths, pedestrian ramps or access roads.
(2) The classes of projects described in subsection (1) do not include projects that
(a) involve the placement of temporary or permanent fill in a water body; or
(b) involve the disturbance of known or suspected subsurface contamination.
6 (1) On lands other than developed lands, the construction, installation, operation, modification, expansion, replacement, removal or decomissioning of any of the following physical works that are related to a building or other structure and that have a footprint, when combined with the footprint of all other physical works related to the building or structure, of no more than 100 m2:
(a) lighting systems;
(b) signage;
(c) fire suppression infrastructure;
(d) parking lots;
(e) paved areas;
(f) charging stations for electrical vehicles;
(g) infrastructure that generates solar or wind power;
(h) fencing that does not prevent the passage of wild animals; and
(i) sidewalks, boardwalks, paths, pedestrian ramps or access roads.
(2) The classes of projects described in subsection (1) do not include projects that
(a) involve the placement of temporary or permanent fill in a water body; or
(b) involve the disturbance of known or suspected subsurface contamination.
PART 4Utility Infrastructure
7 (1) The installation, operation, replacement, modification, decommissioning, abandonment or removal of a hydrant or hook-up that is part of a utility distribution system for a municipality or farm.
(2) The construction, installation, operation, replacement, modification, expansion, removal or decommissioning of water-related utility infrastructure, other than water pipelines, that has a footprint of no more than 100 m2.
(3) The construction, installation, operation, replacement, modification, expansion, removal or decommissioning of water pipelines that are
(a) no more than 100 m in length; or
(b) located underneath, or on developed land that is alongside and contiguous to, a railway or road.
(4) The modification of a water treatment facility.
(5) The construction, installation, operation, replacement, modification, expansion or abandonment of a portion of any of the following physical works that is located more than 30 m from a water body and are underneath, or on developed land that is alongside and contiguous to, a railway or road:
(a) sewers;
(b) drains;
(c) steam lines;
(d) service tunnels; and
(e) overhead or underground telecommunication lines.
(6) The classes of projects described in subsections (1) to (5) do not include projects that
(a) involve the placement of temporary or permanent fill in a water body;
(b) involve the crossing of a water body, other than an overhead crossing by a telecommunication line; or
(c) involve the disturbance of known or suspected subsurface contamination.
PART 5Above Ground Storage Tank Systems
8 (1) The installation, replacement, operation, modification, expansion or removal of an above ground storage tank system for petroleum products or allied petroleum products that is
(a) located within an airport and has an aggregate capacity of no more than 30 000 L; or
(b) located outside of an airport and has an aggregate capacity of no more than 5 000 L.
(2) The classes of projects described in subsection (1) do not include projects that involve the disturbance of known or suspected subsurface contamination.